BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and asbestos abatement for a residential development in Mobile, Alabama. Completed plans call for the demolition of a residential development; for site work for a residential development; and for asbestos abatement for a residential development.

Provide a wet demolition & REMOVE ALL STRUCTURES at the address indicated above, and as described in the attached photos and general notes provided, including all footings, slabs, etc. (FIELD VERIFY) Disconnect and cap off all utility lines, such as sanitary sewer, water, and gas, in a manner satisfactory to the respective agency and the City of Mobile, Municipal Enforcement Department. Contractor shall clear lots by removing all debris resulting from the demolition of structures and all debris as designated in piles, scattered or otherwise on the sites. Contractor is to provide Sediment and Erosion Control measures, grassing, and Best Management Practices for Demolitions where Lead-Based Paint and/or Asbestos containing Materials may be present, per specifications. Submit before and after demolition pictures to City of Mobile Municipal Enforcement Department, along with waste shipment record, Invoice for payment and required close-out documents. 1. Remove damaged wood frame structure 2. Field verify all site conditions 3 . Remove cmu/brick piers and or concrete slab(s) field verify 4. Remove all tires, trash, roof remnants, garbage, etc. Off site 5. Aluminum fence shall remain 6. Remove all vines, bushes, shrubs along the entire perimeter and cut trees with a caliper of 8" or less 4" above grade within the property lines/fence line. 7. Clear entire lot, remove all trash/garbage, cut all grass/weeds up to property lines. 8. Contractor shall fill all voids of disturbed areas per section 02100 demolitions by wet method and section 02100 seeding. 9. Contractor shall provide, install and maintain all temporary erosion control measures. (full protection of state water-dog river watershed) 10. Cap all sewage lines at the curb: notify municipal enforcement department when sewage line is caped. 11. Before and after photos are required with pay request. A City of Mobile Business License is required and must be current at contract execution and throughout contract period. The Contractor shall secure building and other permits customarily obtained from City of Mobile Departments, but at no cost to the contractor. The Contractor shall deliver the Work complete within fifteen (15) calendar days from the date of the written Notice to Proceed.

Post-Bid

Residential Subdivision

$10,000.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
38
Bidding Soon
494
All Active Projects
205
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 28, 2023

February 27, 2024

img_map_placeholder

1157 Kentucky St, Mobile, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.