BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Sequim, Washington. Completed plans call for the renovation of a educational facility.

Sequim School District-wide BMS Modernization Design and installation of district-wide BMS Controls. Design to develop standardized specifications based on the approved framework. Installation to coincide with replacement of HVAC equipment across the district as appropriate. Installation will be turn-key and will include devices, cabling, and power as deemed necessary through the design, effort, Coordination will be required for HVAC units under a separate contract. Question Deadline 01/16/2024 Location: 503 North Sequim Avenue, Sequim, Washington 98382. Remove and Replace Six (6) Existing Ahu's on the Roof of the Opa, With Six (6) New Custom Ahu's as Specified and Detailed Herein. The Owner Has Procured the Units in an Effort to Ensure Installation Prior to December 2023. Enclosed in the Design Package is the Information Necessary for the Gc to Understand What is Being Provided by the Owner and What Will Need to Be Provided by the Gc. The Intent is to Have a Fully Functional(Turn-key) Hvac System in the Building Upon Completion of This Project. Remove and Replace Two (2) Existing Heat Pumps on the Roof of the Opa, With Two (2) New Compu-aire Heat Pumps as Specified and Detailed Herein. The Owner Has Procured the Units in an Effort to Ensure Installation Prior to December 2023. Enclosed in the Design Package is The Information Necessary for the Gc to Understand What is Being Provided by the Owner and What Will Need to Be Provided by the Gc. The Intent is to Have a Fully Functional (Turn-key) Hvac System in the Building Upon Completion of This Project. The Project Includes All Demolition Required to Provide Openings and Space for Each of the New Units. All Roofing Will Be Patched and Repaired to Pre-construction Condition. Install Electric Heat Mat Walk Pads / Snow Melt System on Roof Around New Equipment With Path to Roof Edges and Gutters. Remove and Replace Two Wood Doors

Award

Educational

$800,000.00

Public - City

Renovation

128

50

4

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
55
Bidding Soon
1,140
All Active Projects
434
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

February 1, 2024

img_map_placeholder

503 N Sequim Ave, Sequim, WA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.