EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Suffern, New York. Completed plans call for the renovation of a water / sewer project.

Reference Number 0000338046 GAC Filter Rehabilitation Project in accordance with Drawings, Specifications, and other Contract Documents Job Location Village of Suffern Water Treatment Plant, 26 Pat Malone Drive, Suffern NY 10901 Questions are submitted online Yes Question Deadline 02/15/2024 at 4:00 PM ET change from 01/22/2024 at 4:00 PM ET Questions are submitted online Yes . via email to Linda Kump lkump@panddengineers.com. *OWNERS RIGHTS RESERVED The Village of Suffern hereinafter called the Owner, reserves the right to reject any or all Bids and to waive any formality or technicality in any Bid in the interest of the Owner. o Coordinate with the Village of Suffern Mayor his/her designatee. o Contractor shall coordinate with a carbon supplier to remove activated carbon from three (3) GAC filters in the WTP filter building, each capable of holding 20,000 lbs of media. The Contractor shall furnish and install 60,000 lbs of an approved 12x40 mesh activated carbon media for removal of PFOS and PFOA. o Contractor shall demolish and properly dispose of the existing 8-inch fiberglass reinforced pipe, fittings and valves. o Furnish and Install 8-inch ductile iron pipe, fittings and valves and perform all specified testing. o Furnish and install 1" Schedule 80 PVC pipe from the Water Operations Center to the filter building in an existing pipe sleeve including all valving. o Furnish and install all necessary piping and valving in the Water Operations Center to reconnect the existing sodium hypochlorite and sodium hydroxide injection lines to the filter building. o Furnish and install three (3) injection quills in the filter building. o Bidders for this project are required to comply with the Village Apprenticeship Training Program requirements. o The Contractor shall provide all labor, supervision, materials, equipment, tools, utilities, and incidentals necessary to complete the Work as specified in the Technical Specifications and as shown on the Plans. o This project is funded with New York State Financial Assistance and is subject to MWBE and SDVOB goals and additional required documentation. New York State certified MWBE participation goals for this contract are 20%. Completion- 180 consecutive calendar days

Award

Water / Sewer

$680,102.00

Public - City

Renovation

8

12

6

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
536
Active Projects
299
Bidding Soon
4,987
All Active Projects
2,274
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

March 26, 2024

img_map_placeholder

26 Pat Malone Dr, Suffern, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

GAC Filter Rehabilitation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.