BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 25, 2024 at 8:00 PM

Updated October 15, 2024

Site work for a water / sewer project in Bellevue, Washington. Completed plans call for site work for a water / sewer project.

The Work under this Contract includes, but not limited to, installation of new aboveground storage tanks (ASTs); cleaning, inspection, repair, and lining of existing fuel underground storage tanks (USTs); permanent closure-in-place of existing non-fuel USTs; installation of supplementary sacrificial anodes for cathodic protection of existing steel USTs; and concrete removal/repair as required for installation of supplementary cathodic protection for steel USTs and other UST appurtenance upgrades. - The work location is within a Metro Transit Base which is a high activity, controlled access area that will remain in full operation during the Work, except as specified herein for Work requiring system shutdown. WORK COVERED BY CONTRACT DOCUMENTS A. The general elements of the project include the items below, as detailed in the technical specifications: 1. Installation of Aboveground Storage Tanks (ASTs) including associated piping, pumps, concrete footings and fluid level monitoring/leak detection system. 2. Cleaning, inspection, repair and lining of existing fuel USTs, including upgrade of associated fluid level monitoring/leak detection system. 3. Permanent closure-in-place of existing non-fuel USTs. 4. Installation of supplementary sacrificial anodes for the cathodic protection of existing steel underground storage tanks. 5. Concrete removal, excavation and concrete repair for installation of supplementary cathodic protection for steel USTs and other UST appurtenance upgrades. Engineer's Estimate: $1,300,000 Work site: 1975 124th Ave NE, Bellevue, WA 98005 a. Qualified Disabled Persons 2% of the Apprentice Utilization Goal b. Economically Disadvantaged Youth 7% of the Apprentice Utilization Goal c. Minorities 21% of the Apprentice Utilization Goal d. Women 25% of the Apprentice Utilization Goal If there is a need for special arrangements or sign interpreters at any pre-bid conference or bid opening, please call 206-263-9400, TTY Relay: 711, three (3) days in advance.

Award

Water / Sewer

$1,300,000.00

Public - County

Site Work

122

28

2

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
0
Bidding Soon
1,044
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

July 15, 2024

Project location map

1975 124th Ave NE, Bellevue, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.