BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and asbestos abatement for an office development in Midwest City, Oklahoma. Completed plans call for the demolition of a office development; for asbestos abatement for a office development; and for site work for a office development.

The Midwest City Memorial Hospital Authority (herein "Authority") is an Oklahoma Title 60 Public Trust to serve and benefit the City of Midwest City (herein "City") is currently requesting proposals from qualified firms for site demolition and the demolition and asbestos abatement of the building located at 2828 Parklawn Drive, Midwest City, Oklahoma. Responses should be submitted based on the information and guidelines provided in this Request for Proposals (RFP). The contract will be regulated according to the provisions of all Federal, State and local laws and ordinances that are applicable. The Authority seeks proposals from qualified firms to provide demolition and asbestos abatement services of the Parklawn Plaza office building located at 2828 Parklawn Drive. The Authority intends to select one (1) firm to provide professional demolition and asbestos abatement services for this project. It is anticipated that the Authority and the selected firm will discuss and define a detailed scope of work and negotiate a contract for the project. This project must be completed within 60 days from the date of the notice to proceed. Consultant Interview/Selection Week of January 29, 2024 Award Contract Week of February 5, 2024 Questions concerning this proposal should be directed to Robert Coleman, Director of Economic Development at (405) 739-1202 or via electronic mail at: rcoleman@MidwestCityOK.org. A pre-proposal conference has not been scheduled for this RFP. Performance/Payment Bonds A performance and payment bond, each in the amount of 100% of the final contract price of the construction portion of this project will be required of the successful firm. The successful firm will be required to furnish the required performance and payment bonds within ten (10) business days after written notice of formal award of contract. The Authority reserves the right to reject any and all proposals submitted and/or request additional information for clarification. The respondent shall perform or provide any and all professional services related to the project and obtain all required permits. Respondent represents that all tasks will be performed in accordance with generally acceptable professional standards and further represents that the advice and consultation provided shall be within its authority and capacity as a professional. Respondent will comply with the regulations, laws, ordinances and requirements of all governmental impact applicable to assigned project. Asbestos Abatement o The contractor will be responsible for removal of all asbestos-containing material according to the asbestos survey report prepared for this project and in compliance with all EPA, OSHA, and application State of Oklahoma regulations, and any other applicable law, using best practices. o The contractor shall submit the required notifications to any agency required to be notified. o The contractor shall furnish all labor, equipment, supervision, and incidentals necessary to provide complete asbestos abatement for the structure. o The contractor is responsible for all permits related to the project. o Should it be required the use of a project monitor be used, the contractor shall provide the project monitor and all costs associated with the use of a project monitor. o Any additional cleaning required after the final cleaning will be performed at the expense of the contractor. o All hazardous materials must be handled and properly disposed of according to all applicable laws. o Any additional sampling costs shall be incurred by the contractor. o The contractor shall provide the final asbestos clearance inspection prior to conducting any demolition work. Demolition o The contractor will be responsible for demolition, removal, and proper disposal of the structure and all its contents. o The contractor will be responsible for all costs of transport and proper disposal of all demolition debris. o The contractor shall remove all footings, and concrete slabs associated with the structure. o The contractor is required to use water for dust control during demolition, as needed. o All public streets, gutters, and sidewalks shall be clean of debris, dirt and mud during and at the completion of the project.

Award

Office

$138,840.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
39
Bidding Soon
447
All Active Projects
204
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

February 19, 2024

img_map_placeholder

2828 Parklawn Dr, Midwest City, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.