BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in San Francisco, California. Completed plans call for site work for a municipal facility; for paving for a municipal facility; road / highway; road / highway; and water / sewer project.

Final Date for Receipt of Proposers Questions - December 20, 2023 Only written inquiries will be accepted: California Department of Transportation Division of Procurements and Contracts 1727 30th Street Sacramento, California 95816-7006 Attention: Denetia Floyd-Smith, Contract Analyst e-mail: denetia.smith@dot.ca.gov The Project is located on Route 101, in the City of San Francisco from post mile 0.0 to post mile M5.4. Rehabilitate roadway and drainage, upgrade concrete barrier and Transportation Management System (TMS) elements, and upgrade facilities to Americans with Disabilities Act (ADA) standards. A more detailed description of the Project is contained in Appendix A.. The estimated cost of this CMGC Project (in 2023 US dollars) is $69,027,000 for construction capital and $250,000 for Right of Way capital (including utility relocation). Please refer to the RFQ for goal requirement and attachments for licensing requirements for this contract. Unfortunately, the Department does not have a plan holders list of available proposers, nor does it have a way of identifying companies or entities that may have downloaded the project documents for teaming purposes. It is the responsibility of the consultants/subs/vendors to identify teams that may be submitting an Statement of Qualifications. The Department will allow the use of text with font size smaller than 12-point for only charts, tables, exhibits, and other illustrative and graphical information. Addendum 1 - This Addendum is for the Department to respond to concerns submitted by proposers. Pre Bid Conference (N/A) It is currently anticipated that the selected Proposer shall submit payment and performance bonds upon execution of the Construction Contract. The payment bond shall be equal to 100 percent of the Agreed Price and the performance bond shall be equal to 50 percent of the Agreed Price. Proposers shall demonstrate their capacity to obtain the required bonds. Anticipated Notice to Proceed 3/19/2024 Construction Complete 4/1/2027

Post-Bid

Roads / Highways

$69,027,000.00

Public - State/Provincial

Paving, Site Work

20

9

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
82
Bidding Soon
1,840
All Active Projects
748
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2024

March 19, 2024

img_map_placeholder

US-101, San Francisco, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.