Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a clubhouse / community center in Park Hill, Oklahoma. Completed plans call for the renovation of a clubhouse / community center.
Description The Cherokee Nation is accepting bids from interested parties for the complete renovation of the modular office space site located at the Durbin Feeling Language Center Campus in Tahlequah, Oklahoma (Cherokee County). Indian Preference applies to all Cherokee Nation requests for bids or proposals. To receive preference, bidder must be TERO certified through the Cherokee Nation Tribal Employment Rights Office; proof of certification must accompany submittals. Successful bidder will be obligated to comply with Tribal rules and regulations and TERO. Contractor will coordinate all billing with the Project Manager. For pre-bid questions, please submit: No Later than Tuesday, January 9th 2024. Bidder/Contractor shall: Include all necessary materials, labor, and equipment to perform all scopes of work within this specification. Furthermore, it is the responsibility of the Bidder/Contractor to understand and account for all conditions, whether specified or implied, within this specification. In the absence of written or implied direction, Bidder/Contractor shall account for and bid the higher/more costly of the interpretation of this specification. All work described below shall be to industry standards as well as all applicable codes. Bidder/Contractor has full responsibility for verifying location of existing underground utilities and will be liable for any outage or damaged caused by failure to safely excavate or locate. Cherokee Nation Planning and Development department will hold final discretion for performance of work and completion of contract. Contract shall be made whole with all punch items completed to satisfaction, prior to final billing. Bidder/Contractor shall bid line items, as detailed below for a specific site/location. Three modular buildings Bidder/Contractor shall direct bury Electrical Service Cable in Conduit to all three modular buildings of proper size and type for Electrical Utility Service. o Bidder/Contactor shall provide and install a Unistrut Framework with 3 - 200amp meter loops and 3 - 200 amp main disconnects (Location TBD by P&D). o Bidder/ Contractor will provide and install direct bury cable and conduit from meter loop disconnects to each individual building and make all connections to the three modular buildings. o All electrical installation and work shall be performed in compliance to all current code requirements and/or professional industrial standards. Bidder/Contractor shall bid for Installation and connection of Sewage Systems o Bidder/Contractor shall provide and install septic distribution lines from Speaker Services Building, Building "A" and Building "B" and make connections to existing structure as per owner's sketch. (See attachment 'A'. All measurements to be field verified. There is no Septic Tank or Leach Field on this scope.) o Bidder/Contractor shall disconnect and cap existing distribution line on Speaker Services Building and tie into new distribution line after new line and temporary tank is installed. Timing shall be so that there is minimal out of service time possible (Speaker Services Building is currently occupied). o Bidder/Contractor shall provide, make all connections, and install complete Water Line of appropriate size and type as approved by CN-OEH and DEQ. o Sewer lines shall be bedded in with sand or other appropriate bedding material as approved by the owner. Bidder/Contractor shall bid for Installation and connection of Water Systems o Bidder/Contractor shall provide and install water distribution lines for Building "A" and Building "B" and make connections to existing water line located at the Speaker Services Building (See attachment 'A' for reference only. All measurements to be field verified.) o Water lines shall be bedded in with sand or other appropriate bedding material as approved by the owner. Bidder/Contractor shall bid for Repairs to Siding, for all three buildings o Bidder/Contractor shall provide, replace, and install any damaged, missing, or defective existing siding. o Bidder/Contractor shall install new siding to match existing and to cover exposed structural wood frame base then trim out accordingly. o Bidder/Contractor shall make siding, trim, soffit & facia ready for paint/ finish. o Bidder/Contractor shall paint all siding, trim, soffit, and Fasia with minimum two (2) coats of exterior grade paint. Color to be approved by owner. Bidder/Contractor shall bid for Repair, Replacement, or Install Seamless Rain Gutter and Downspouts o Bidder/Contractor shall provide new seamless gutter and downspouts for the buildings without existing gutter and downspouts. o Existing Gutter and Downspouts shall be repaired or replaced as needed and downspouts will be extended to ground level with proper discharge chute. o All Gutter and Downspouts shall match existing color and style. Bidder/Contractor shall Repair and/or replace where necessary any damaged Roof Sheets o Any torn or cut roof sheets will be replaced with new, color-matching roof sheets of same style and design. o Bidder/Contractor shall replace all pipe jacks at all roof penetrations. o Bidder/Contractor shall replace any damaged roof trim, valley, rakes, ridge, and fascia metal. Color to match existing. Bidder/Contractor shall Replace ALL existing Storm Doors on all three Buildings o Bidder/Contractor shall install all new storm doors with appropriate type to match existing color and style of building. o All new Building Storm Doors will swing to the appropriate direction so as not to cause an obstruction to enter/exit facility. Question Deadline 01/09/2024 at 5:00 PM CT All questions or requests for interpretation of the bid must be submitted in written format to Cherokee Nation Acquisition Management. Requests maybe e-mailed to michelle-parsons@cherokee.org.
Award
Clubhouse / Community Centers
$95,611.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 18, 2024
February 19, 2024
W Hasting Shade Ave, Park Hill, OK
Related To This Project
Park Hill, OK
Bid Date: Jan 09 2024
Park Hill, OK
Bid Date: Feb 14 2024
Park Hill, OK
Bid Date: Feb 23 2024
Park Hill, OK
Bid Date: Jun 03 2024
Park Hill, OK
Bid Date: Jun 26 2024
Park Hill, OK
Bid Date: May 24 2024
Park Hill, OK
Bid Date: Jun 17 2024
Park Hill, OK
Bid Date: Jun 17 2024
Park Hill, OK
Bid Date: Nov 17 2023
Park Hill, OK
Bid Date: Oct 27 2023
Park Hill, OK
Bid Date: Mar 08 2022
Park Hill, OK
--
Park Hill, OK
Bid Date: Sep 05 2023
Park Hill, OK
Bid Date: Jun 02 2023
Park Hill, OK
Bid Date: Jan 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.