BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a bridge / tunnel in Goodyear, Arizona. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Gila River Crossing at Old US80 Provide a Candidate Assessment Report (CAR) Last Day for Questions January 4, 2024 Notice to Proceed (estimated) April 2024 A maximum of one (1) contract will be awarded. The contract period will be for a minimum of three hundred sixty five days (365) calendar days after approval by the Maricopa County Board of Supervisors. The Arizona Department of Transportation has established an overall annual goal for DBE participation on Federal- aid contracts. ADOT intends to meet the goal with a combination of race-conscious efforts and race-neutral efforts. Race-conscious participation occurs where the Consultant uses a percentage of DBEs to meet a contract-specified goal. Race-neutral efforts are those that are, or can be, used to assist all small businesses or increase opportunities for all small businesses. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount, shall be 0.0 %. Prime Consultants are encouraged to obtain DBE participation above and beyond the goal on this contract. The Maricopa County Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252.42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Firms that have not already prequalified with ECS and who intend to submit an SOQ for the proposed contract shall successfully submit the Prequalification application to ECS no later than 14 BUSINESS DAYS BEFORE SOQ DUE DATE. Any submissions for Prequalification with ECS received after 14 BUSINESS DAYS BEFORE SOQ DUE DATE are not guaranteed to be reviewed or approved by the SOQ due date.

Post-Bid

Bridges / Tunnels

$200,000.00

Public - County

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
11
Bidding Soon
686
All Active Projects
242
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2024

April 1, 2024

img_map_placeholder

US80, Goodyear, AZ

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.