BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Golden Valley, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of February 20, 2024, this project has not yet been awarded. The project is expected to be awarded sometime in March 6.** the furnishing of all labor and material for the construction of the 2024 Pavement Management Program. Major quantities for the Work include. Description Quantity Unit Salvage/Remove Bituminous Pavement 17,700 SY Remove Concrete Pavement 7,100 SY Clearing/Grubbing 35 TREE Common Excavation 29,200 CY Select Granular Borrow 39,300 TONS Class 5 Aggregate Base 10,800 TONS Bituminous Mixture 5,300 TONS 4"-6" Concrete Walk 8,100 SF Concrete Curb and Gutter 12,500 LF 6" Concrete Driveway Pavement 2,200 SY Sanitary Sewer Lining 5,300 LF Sanitary Sewer Service Wye Grouting/Liners 83 EA Sodding with 4-Inches of Topsoil 19,000 SY 6"-8" PVC (C-900) Water Main 6,100 LF 6"-8" Gate Valve and Box 29 EA F&I Hydrant 11 EA 15"-27" Reinforced Concrete Storm Sewer Pipe 1,900 LF Drainage Structures & Castings 44 EA The City of Golden Valley reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the City of Golden Valley. Bid security in the amount of 5 percent (5%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. * The Bidding Documents are available for viewing by appointment only. Please call the City of Golden Valley Engineering Department at 763-593-3987 to schedule an appointment at the following location: City of Golden Valley Engineering Department - 7800 Golden Valley Road Golden Valley, MN 55427-4588 Substantially Completion- September 27, 2024 Final completion - June 27, 2025 The project is located inside the approximate quadrant of 23rd Avenue, Winnetka Avenue, Duluth Street and Wisconsin Avenue in Golden Valley, Minnesota. The list of streets included in this project include: o Wisconsin Avenue o Orkla Drive o Valders Avenue o Winnetka Heights Avenue o West Bend Road o Duluth Street The project consists of reconstructing the existing streets and replacing the storm sewer as necessary. Watermain is also to be replaced at select locations.

Award

Sidewalks / Parking Lot

$4,846,488.00

Public - City

Paving, Site Work

142

11

6

14

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
69
Bidding Soon
1,667
All Active Projects
580
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 30, 2024

February 29, 2024

June 27, 2025

img_map_placeholder

Multiple Locations, Golden Valley, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.