BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Santa Maria, California. Completed plans call for the renovation of a municipal facility.

Gutter and Downspout Removal and Replacement Services in Santa Barbara County. Proposed Award Date (estimate) 01/30/2024. Question Deadline 01/08/2024 at 10:00 AM PT In the opinion of the California Department of Transportation (Caltrans), this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is: Tiaja Watson California Department of Transportation (Caltrans) Email address: Tiaja.Watson@dot.ca.gov Phone: (279) 234-2527 Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an office. Payment Bond Requirement: If the successful bidder's bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor's obligations under this Agreement. Bidder shall be properly licensed in accordance with the laws of the State of California and shall possess at the time of bid submittal and for the duration of the Agreement, a valid, current C-43 - Sheet Metal Contractor or C-61/D-24 - Metal Products Contractor issued by the Contractors State License Board (CSLB). Caltrans reserves the right to reject all price quotations for reasonable cause. A. Contractor shall provide all labor, materials, tools, travel, permits, equipment, and incidentals necessary to provide gutter and downspout removal and replacement services to the following buildings at the Santa Maria Maintenance Station: 1) Building #4 - Remove 150' gutter and two (2) downspouts; Install 300' new gutter and four (4) downspouts 2) Building #5 - Remove 50' gutter and one (1) downspout; Install 100' new gutter and two (2) downspouts 3) Building #6 - Remove 90' gutter and two (2) downspouts; Install 180' new gutter and four (4) downspouts 4) Building #7 - Remove 50' gutter and one (1) downspout; Install 100' new gutter and two (2) downspouts 5) Building #8 - Remove 90' gutter and one (1) downspout, Install 180' new gutter and two (2) downspouts B. Gutter and Downspout removal and Replacement 1) Contractor shall removal of old gutters and downspouts from buildings specified in paragraph A, above. 2) Contractor shall replace stifling brackets as needed behind gutters, 1/4 " x 1 1/4 " steel 3) Contractor shall haul off and dispose of all old materials in accordance with local and state laws. 4) Contractor shall install new 22-gauge (ga) gutter to match existing gutter, Standard Taylor Metals, or equivalent. 5) Contractor shall tie in gutter to gable ends of buildings 6) Contractor shall lap and notch gutter minimum of four inches (4") 7) Contractor shall slope gutters to downspouts 8) Contractor shall install end caps at gutter ends 9) Contractor shall install gutters true and uniform to industry standards 10) Contractor shall install 16-ga gutter brackets 24" on center 11) Contractor shall fasten all gutters at top of roof, match existing attachments and fasteners 12) Contractor shall install new 22 ga 4" x 4" downspouts/Standard Taylor Metals Color or equal 13) Contractor shall install drop tubes for downspouts 14) Contractor shall strap all downspouts at wall to match existing 15) New downspouts and gutters shall be white in color.

Post-Bid

Municipal

$206,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
15
Bidding Soon
252
All Active Projects
110
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2024

February 15, 2024

img_map_placeholder

2201 S Thornburg St, Santa Maria, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.