BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Pensacola, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Counties: Escambia Road Name: SR 30 (US 98) (GREGORY ST) Limits: From Palafox St to E of 14th Ave Project(s): 43467815201(*) Federal Aid No: D323042B Project(s): 43467815202 Federal Aid No: N/A Total Roadway Length: 1.137 Miles Contract Days: 200 Total Bridge Length: 0.000 Miles Letting Date: 01/31/24 Total Proposal Length: 1.137 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Description: The Improvements under this Contract consist of milling and resurfacing. Other incidental work includes signalization, lighting, ITS and signing and pavement marking improvements on SR 71 from North of SR 8 (I-10) to SR 10 (US 90) in Jackson County. Question Deadline 01/24/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 016: Resurfacing / Drainage Improvements / Sidewalk / Pavement Markings - US-98 The Improvements under this Contract consist of milling and resurfacing SR 30 (US 98) Gregory St from Palafox St to E of 14th Ave in Escambia County. Also included are signal improvements, signing and pavement markings, ADA improvements, minor drainage work, and lighting from west of Tarragona St to end project. These items will be done under FPID 434678-1-52-01. Utility work by the Highway Contractor, including valve box and manhole adjustments, will be done under FPID 434678-1-52-02.

Award

Roads / Highways

$2,823,614.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

147

9

8

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
28
Bidding Soon
453
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

February 10, 2024

img_map_placeholder

US-98, Pensacola, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.