BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Fontana, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Street Rehabilitation including removal and replacement of existing asphalt and concrete and upgrades to existing driveway. The project is located on Rose Avenue, west of Calabash to end of cul-de-sac. Bid Valid : 90 days Liquidated Damages : $1,500 for each calendar day in excess of the time. Estimated Bid Value : $295,000.00 Start/Delivery Date : Approximately March 2024 Project Duration : 45 Working Days after the date of Notice to Proceed. Online Q&A : Yes Question Deadline 01/04/2024 at 2:00 PM PT Online Q&A : Yes Any questions pertaining to this project should be directed to Sid Lambert at phone number (909) 350- 7678 or email at slambert@fontana.org The City reserves the right to reject any or all bids, to waive any irregularity, to accept any bid or portion thereof, and to take all bids under advisement for a period of ninety (90) calendar days. A. The Contractor shall assume sole, complete, and continuous responsibility for storm water runoff management and erosion/sedimentation control during construction. The Contractor shall know and fully comply with the applicable provisions of the Manuals and Federal, State, and local regulations that govern the Contractor's operations and storm water discharges from both the project site and areas of disturbance outside the project limits during construction. B. The Contractor shall prepare a storm water management plan for all associated construction activities. This plan shall include drawings showing methods for erosion and sediment control, sediment treatment control, wind erosion, vehicle and equipment tracking control, and non-storm water waste management. The plan shall outline what measures will be used as conditions change along the alignment. The plan shall also include a description of the sequence of construction and all storm water control procedures to be used. C. The Contractor shall fully comply with all applicable state and local regulations and requirements related to storm water management and sedimentation and erosion control including San Bernardino County, City of Fontana, and Caltrans requirements. D. The Contractor shall furnish all labor, materials, equipment, and incidentals necessary to perform all installation, maintenance, removal, and area cleanup related to erosion control devices and practices necessary to prevent the movement of sediment from the construction site to off-site areas including surface waters, storm drains, and flood control facilities. E. The Contractor shall implement Best Management Practices (BMP) including good housekeeping practices and erosion and sedimentation control to prevent the direct and indirect contribution of any contaminants into the storm drain system or waters of the United States. F. The Storm Water Pollution Prevention Plan (SWPPP) shall identify pollution sources that may adversely affect the quality of storm water discharges associated with the project and shall identify water pollution control measures, hereafter referred to as control measures, to be constructed, implemented, and maintained in order to reduce to the extent feasible pollutants in storm water discharges from the construction site during construction under this contract. The (SWPPP) shall incorporate control measures in the following categories: a. Soil stabilization b. Sediment control c. Tracking control d. Wind erosion control e. Non-storm water control f. Waste management and material pollution control

Award

Roads / Highways

$217,777.00

Public - City

Paving, Site Work

5

5

4

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
103
Bidding Soon
2,244
All Active Projects
889
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2024

February 12, 2024

img_map_placeholder

Rose Ave, Fontana, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.