Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Hurley, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
**As of March 6, 2024 project was awarded to Jakes Excavating and Landscaping for $2,314,339.75. ** The work for which bids are asked includes the following: 300 L.F. 12 inch diameter PVC Sanitary Sewer 125 L.F. 10 inch diameter PVC Sanitary Sewer 1700 L.F. 8 inch diameter PVC Sanitary Sewer 750 L.F. 6-inch diameter PVC Sanitary Sewer Lateral 2100 L.F. Televise Sanitary Sewer 2450 L.F. 8-inch diameter DIP Class 52 Watermain 125 L.F. 6-inch diameter DIP Class 52 Watermain 1100 L.F. 1-inch diameter Copper Water Lateral 750 L.F. 12-inch to 42-inch diameter RCP Storm Sewer 9300 C.Y. Unclassified Excavation/Asphalt/Crushed Concrete Removals 11500 Ton Crushed Aggregate Base Course 3650 Ton Asphaltic Pavement 16200 S.F. 4-inch thick concrete sidewalk 5400 S.F. 6-inch thick concrete driveway and sidewalk 6000 L.F. Pavement Marking 1 L.S. Turf Restoration of All Disturbed Areas CONTRACTOR PRE-QUALIFICATION IS REQUIRED. Qualifications are due by 10:00 am on January 8, 2024. PreQualification forms can be obtained by contacting MSA Professional Services No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. OWNER reserves the right to waive any informalities or to reject any or all bids. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization . The City of Hurley is planning improvements to USH 51 from Iron Street to Bernard Street. To assist planning and design, Ms. Joanne Bruneau, Mayor of Hurley, authorized American Engineering Testing, Inc. (AET) to conduct a subsurface exploration program at the site and perform a geotechnical engineering review for the project. This report presents the results of the above services and provides our engineering recommendations based on this data. All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Questions received less than ten days prior to the date for opening of Bids may not be answered. Contractor shall furnish performance and payment bonds, each in an amount at least equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. Goals for Women = 6.9 percent (this goal applies nationwide) Minority Goals - percentage Iron County 1.2.
Award
Sidewalks / Parking Lot
$2,314,340.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 25, 2024
May 1, 2024
US-51, Hurley, WI
Related To This Project
Hurley, WI
Bid Date: May 16 2024
Hurley, WI
Bid Date: Mar 18 2024
Hurley, WI
Bid Date: Mar 18 2024
Hurley, WI
Bid Date: May 30 2024
Hurley, WI
--
Hurley, WI
--
Hurley, WI
--
Hurley, WI
Bid Date: Dec 10 2024
Hurley, WI
Bid Date: Dec 20 2023
Hurley, WI
Bid Date: Mar 21 2022
Hurley, WI
Bid Date: Mar 21 2022
Hurley, WI
Bid Date: Jan 11 2022
Hurley, WI
Bid Date: Aug 07 2023
Hurley, WI
Bid Date: Mar 12 2024
Hurley, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.