BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Minneapolis, Minnesota. Completed plans call for the renovation of a educational facility.

The Board of Regents of the University of Minnesota (the University) is requesting Proposals to provide construction services for exterior repairs at Anderson Library, located on the west bank of the Twin Cities campus (the Project). Miller Dunwiddieis the Architect/Engineer of Record for the Project If required by Minnesota Statutes, the selected Respondent must furnish to the University a Performance Bond and a Labor and Material Payment Bond for the Project on University-approved bond forms, which are available on-line Question Deadline 01/16/2024 at 12:00 PM CT The total construction budget for this Project is $1,000,000 1. The intent of the project is to complete the Andersen Library Exterior Envelope Repairs Phase I project, for the Owner on a fast-track basis. It is essential that the project be completed within the shortest timeframe possible and within the period indicated. 2. The intent of the project is to require the Prime Contractor to provide all labor and material required to complete the project on the dates indicated. 3. The work generally includes the following: a. Building general construction work, for building and site clearing, as well as the repair, patching or replacing of items or surfaces cut or removed for the work including the following major items of work: Selective Demolition, Cement Concrete Pavement, Pavement Joint Sealants, Site Restoration, Cast Stone, Brick Masonry Assemblies, Masonry Through-wall Flashing, Railing Painting, Miscellaneous Carpentry, Sheathing, Elastomeric Sheet Waterproofing, Thermoplastic Sheet Waterproofing, Hot Fluid-Applied Rubberized Asphalt Waterproofing, Membrane Leak Detection System, Bentonite Waterproofing, Water Repellents, Sheet Metal Flashing and Trim, Joint Sealants, and related work. b. Removal and disposal of existing materials removed or demolished. c. Temporary facilities as required for the project, protection of existing site and adjacent buildings, and temporary staging areas as required. d. Workers shall keep interior building locations used clean. Workers shall remove boots or clean boots before entering buildings.

Under Construction

Library

$1,000,000.00

Public - State/Provincial

Renovation

13

22

2

2

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
86
Bidding Soon
799
All Active Projects
315
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2024

February 5, 2024

img_map_placeholder

222 21st Ave S, Minneapolis, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.