BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a municipal facility in Anoka, Minnesota. Completed plans call for the remodel of a 6,321-square-foot, two-story above grade municipal facility.

The project consists of the construction of office support spaces. The work of this single prime contract includes interior finishes and mechanical and electrical systems. Question Deadline 01/24/2024 at 3:00 PM CT All questions regarding the protest should be directed to: Lindsey Felgate, Purchasing Manager 763-324-1735 or Lindsey.Felgate@anokacountymn.gov 2. Work under this Contract includes: a. Interior Finishes: 1) Insulated gypsum board/metal stud partitions. 2) Floor finishes of carpet and porcelain tile. 3) Wall finishes of vinyl wallcovering and porcelain tile. 4) Ceiling finishes of acoustical lay-in tile. 5) Plastic laminate casework, HM frames, aluminum storefronts, wood doors, hardware and glazing. b. Mechanical Systems: 1) Plumbing including, supply and waste piping systems, piping insulation and plumbing fixtures. 2) Ventilation to include VAVs, ductwork and duct insulation. 3) Temperature control system modifications. c. Electrical Systems: 1) Electrical conduit and wiring. 2) Interior lighting. 3) Low voltage work to include: Data cabling. 4) Fire alarm. 3. Work self-performed by the owner includes: F. Keep Architect fully informed about progress of the work, performance of the work and potential problems. 1.02 WORK BY OWNER THROUGH OTHER CONTRACTS A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts. B. Future Work: Owner will award separate contract(s) for the following additional work to be performed at site after Substantial Completion. Completion of that work will depend on successful completion of preparatory work under this Contract. 1. Furnishings and movable equipment. 1.03 OWNER OCCUPANCY A. Owner intends to continue to occupy adjacent portions of the existing building during the entire construction period. B. Cooperate with Owner to minimize conflict and to facilitate Owner's operations. C. Schedule the Work to accommodate Owner occupancy. 1.04 CONTRACTOR USE OF SITE AND PREMISES A. Construction Operations: Limited to areas noted on Drawings. 1. Locate and conduct construction activities in ways that will limit disturbance to site. 2. Contractor is to visit site and be familiar with existing conditions. Contractor will be required to accept existing conditions on site prior to mobilizing. 3. Conform to City's noise control regulations, including limited hours of construction operations.

Bid Results

Municipal

$2,349,000.00

Public - City

Remodeling

65

23

34

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
65
Bidding Soon
1,585
All Active Projects
558
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 2, 2024

April 1, 2024

December 31, 2024

img_map_placeholder

2100 3rd Ave, Anoka, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.