BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 15, 2024 at 8:00 PM

Updated March 16, 2024

Site work and paving for a civil project in Whittier, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The work to be performed consists of removal and replacement of concrete pavement, water and sewer main in Palm Avenue from Whittier Blvd. to Beverly Blvd., and appurtenant work, in accordance with the project plans as specified hereinafter, project specifications as specified hereinafter for the Whittier Utility Authority, Los Angeles County, State of California, and in accordance with the Standard Specifications for Public Works Construction (The Greenbook), 2021 Edition. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project and be responsible for obtaining a no fee excavation permit(s) for the project from the City of Whittier, Public Works Department. Question Deadline 02/1/2024 at 5:00 PM PT Requested Clarifications Shall Be Made in Writing via Email at Pubwks@qtyofwhittier.qrg, NO VERBAL REQUESTS WILL BE ACCEPTED. Engineers Estimate: $9,800,000 The Contractor shall commence ordering all necessary materials within ten (10) calendar days after notification that the contract has been executed and shall be completed within two hundred and ten (210) working days after the date set forth in the Notice to Proceed. The contractor shall possess a Class A (General Contractor) in accordance with the provisions of the Contractor's License Law (California Business and Professions Code, Section 7000,et. seq.) and rules and regulations adopted pursuant thereto at the time this contract is awarded. Pursuant to the provisions of Section 1770 to 1777, inclusive, of the Labor Code of the State of California, copies of the prevailing rate of per diem wages are on file in the office of the Secretary-Treasurer of the Whittier Utility Authority, 13230 Penn Street, Whittier, California 90602. Interested parties may review them at that location. Whittier Utility Authority reserves the right to reject any or all bids, to accept any portion of any bid, to waive any informality in a bid, and to make awards in the best interest of the City. No bidder may withdraw his/her bid for a period of thirty (30) days after the bid is received.

Award

Roads / Highways

$8,390,957.00

Public - City

Paving, Site Work

46

6

15

2

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
681
Active Projects
282
Bidding Soon
3,345
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

March 18, 2024

Project location map

Palm Ave & Monte Vista Dr, Whittier, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.