Published March 22, 2024 at 8:00 PM

Updated March 23, 2024

Site work, paving and new construction of a bridge / tunnel in Columbia, Missouri. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of March 22, 2024 project was awarded to E&C bridge, awarded amount is $599,903.87.** Proposal for Constructing Bridge No. 35000021, BRO-R010(20) in Boone County. The proposed work includes the construction of a new 62 single-span, W27x114 steel girder bridge with galvanized steel piling (HP12x53), concrete abutments, Kansas Corral bridge railing, steel approach rails, traffic control, and all appurtenances. Special Needs: If you have special needs addressed by the Americans with Disabilities Act, please notify the County Clerk at (573) 886-4375 at least 5 working days prior to the bid opening you plan to attend. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2023 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. The right is reserved to reject any or all bids. A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The DBE goal for this project is 4%. No 2nd tier subcontracting will be allowed on this project. The Contract, if awarded, will be awarded to the lowest responsive, responsible bidder who provides the lowest price complying with the Conditions of the Contract Documents within the Owner's budget. MODOT - Constructing Bridge No. 35000021 This project is located where Ben Williams Road crosses over Gans Creek approximately 650 feet south of the intersection of E New Haven Road and Ben Williams Road about 2 miles east of the city of Columbia, Missouri

Award

Bridges / Tunnels

$599,904.00

Public - County

New Construction, Paving, Site Work

33

8

5

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
26
Bidding Soon
496
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

April 1, 2024

Project location map

To Be Determined, Columbia, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.