BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Hilo, Hawaii. Completed plans call for the renovation of a educational facility.

Furnish and install Twenty-eight (28) Daikin model number RK24AXVJU (Outdoor unit) & FTX24AXVJU (Indoor Unit) 24,000 BTU Ductless Split Units. Building A (24 Ductless Split Units) 1 (2 units) 3 (2 units) 4 (2 units) 5 (2 units) 7 (2 units) 9 (2 units) 13 (2 units) 15 (2units) 16 (2 units) 17 (2 units) Air Conditioning Units: o Before ordering equipment, provide specifications of A/C units to Project Coordinator for approval. o Condensation drain lines shall be ran to the exterior of the building. o Any equipment and/or installations changes identified during the pre-bid meeting/walkthrough shall be verified and approved by the Project Coordinator. o Changes will be posted as an Addendum to the Scop 19 (2 units) 20 (2 units) 21 (2 units) 2 (2 units) o Condensers are to be installed under building A. o Install four (4) wall mounted exhaust fans under building A at window controlled by a timer. o Start-up and check out the operation of the equipment installed. Making sure there is not excessive noise or vibration. There should be no leaks in the system. Electrical: o Contractor shall provide all necessary components for a complete installation of all A/C units; including but not limited to conduits, wiring, outlets, etc. for the fourteen (14) classrooms. o Contractor shall provide all necessary components for a complete installation of the four (4) wall mounted exhaust fans controlled by a timer; including but not limited to conduits, wiring, outlets, etc. Patching: o All penetrations through walls/windows shall be completely sealed. o All added and/or replaced lumber and/or plywood shall be patched and painted. Wood trim shall be used for gaps larger than 1/4 inch. o Any damages caused by the contractor's work shall be properly patched and painted to match surrounding areas. Project is tentatively scheduled to commence upon award of contract and must be completed by July 26, 2024. Any work which would disrupt the classroom should be scheduled for "No Students" days (calendar provided by the school) or pre-arranged relocation of students if possible A performance bond is required for all projects $50,000 and above

Award

Educational

$249,948.00

Public - County

Renovation

5

3

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
3
Bidding Soon
45
All Active Projects
15
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

March 1, 2024

img_map_placeholder

506 Waianuenue Ave, Hilo, HI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.