BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Park Forest, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and sidewalk / parking lot.

This work consists of: All mobilization, excavation, material, labor, equipment and incidentals necessary for 7,400 S.Y of HMA removal and replacement, 4,150 L.F. remove and replace of curb and gutter, miscellaneous storm sewer repairs, inlets, manholes, sidewalk, and traffic control to complete the project. The Village reserves the right to refuse to issue plans, bid forms, and specifications to any person, firm, or corporation that it considers to be unqualified. Proposals must be submitted on the forms provided. No bid shall be withdrawn after the opening of bids without the consent of the Mayor and Board of Trustees of the Village of Park Forest. The Village reserves the right to accept or reject any or all bids, to waive any informalities or irregularities in the bids, and to make such award as it may deem to be in the best interest of the Village. The contractor shall be required to furnish sufficient insurance and guaranty of indemnity to the Village of Park Forest, Illinois against any and all claims which might arise for damages to persons or property due to the negligence of himself, his employees, or his agents during the construction of said improvement and until said improvement has been fully accepted as complete by the Mayor and Board of Trustees of the Village of Park Forest. No less than the prevailing rate of wages as determined by the Department of Labor or determined by the court on review shall be paid to all laborers, workmen and mechanics performing work under this contract. The Village of Park Forest is located in Cook and Will Counties. Any questions regarding this project shall be submitted in writing or by email by January 18, 2024 to Nicholas Christie, Assistant Director of Public Works, Village of Park Forest, 350 Victory Drive, Park Forest, IL 60466, nchristie@vopf.com.

Award

Roads / Highways

$815,640.00

Public - City

Paving, Site Work

12

6

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
126
Bidding Soon
1,833
All Active Projects
840
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2024

February 23, 2024

img_map_placeholder

Hemlock St, Park Forest, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.