BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2024 at 7:00 PM

Updated January 29, 2024

Renovation of an educational facility in Castlegar, British Columbia. Completed plans call for the renovation of a educational facility.

The work includes, but is not limited to, the renovation of: The existing Female & Male Washrooms on the Lower Floor of O Wing (each @ approximately 325 square feet) at the Castlegar Campus of Selkirk College located at 301 Frank Beinder Way, Castlegar, BC V1N 4L3. The work includes demolition, steel studs, drywall, interior finishes (painted gypsum board,ceramic floor & wall tile) millwork, ceramic floor and wall tile, millwork, supply and installation of miscellaneous specialties, painting, mechanical and electrical work. The work includes minor remediation of hazardous materials. Refer to Pre-Renovation Hazardous Materials Survey Report included with these documents.

Post-Bid

Educational

$100,000.00

Public - State/Provincial

Renovation

11

9

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
9
Bidding Soon
116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

March 1, 2024

Project location map

301 Frank Beinder Way, Castlegar, BC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.