BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Visalia, California. Working plans call for site work for a playground / park / athletic field.

The owner has determined a prequalified list of design build companies. Reference Number 0000338613 The City of Visalia is requesting proposals from qualified firms to design and install a playground structure at Woodland Park, located at 1701 N. Woodland Street in Visalia, CA. This public works project is funded by federal award grant SLFRP2005, awarded to the City of Visalia by the US Department of the Treasury. Federal funds being utilized for this project are ARPA funds, and vendor will be responsible to adhere to state and federal funding requirements. The City of Visalia does not provide an Engineer's Estimate, however the total approved budget for this project is approximately $250,000 which is an estimate of the total project delivery costs. This project is supported, in whole or in part, by federal award number SLFRP2005, awarded to City of Visalia . PROJECT COMPLETION: Contractor shall order playground equipment and shade structure within ten (10) days of receiving the Notice to Proceed and complete the project within forty-five (45) working days after equipment has been delivered. Question Acceptance Deadline 01/25/2024 at 4:00 PM PT Questions are submitted online No -- questions be submitted in writing via email to purchasing@visalia.city. Job Location 1701 N. Woodland Street, Visalia, CA General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Federally Funded - Installation Required - Insurance Required - Prevailing Wage Required - Warranty Information Required Woodland Park Playground Design Work is to include: o The demolition and removal of the existing playground structure. o Design of a 5 to 12 age-appropriate play system within the constructed play area boundaries, with minimal to no alterations to existing concrete curbs, equipment footings, landing mats. o Design of a free-standing sail type shade structure to provide maximum coverage over entire playground structure. o A minimum of twelve (12) inches of wood fiber fall zone material installed. o Installation of all playground equipment and shade structure. o Certified safety inspection of completed playground structure. This project will be the final turnkey step in completing the overall Woodland Park Playground Replacement Project. Playground Suppliers shall submit a maximum of (2) two designs per age-appropriate playground. Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 % -- Awarded Contractor shall be required to submit a Performance Bond in the amount of one hundred percent (100%) of the agreement, as surety condition for the full, complete and faithful performance of the agreement. In addition, Awarded Contractor shall be required to furnish a Labor and Materials Bond in the amount of one hundred percent (100%) of the agreement if subcontractors are proposed to be used to complete this project. LICENSE REQUIREMENTS: No bid will be accepted from a Contractor who is not duly licensed in accordance with the provisions of Chapter 9, Division III of the State of California Business and Professions Code and has a current Class D-34 Contractor's license (minimum). *The right is reserved by the City of Visalia to reject any or all proposals, to waive any irregularities or informalities not affected by law, to evaluate the proposals submitted and to award the contract according to the proposal which best serves the interests of said City.

Final Planning

Playgrounds / Parks / Athletic Fields

$250,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
27
Bidding Soon
420
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

June 3, 2024

img_map_placeholder

1701 N Woodland St, Visalia, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.