Published February 27, 2024 at 7:00 PM

Updated February 28, 2024

Site work for a civil project in Hedrick, Iowa. Completed plans call for site work for a road / highway; and water / sewer project.

**As of February 27, 2024, project was awarded to Division 1 awarded to KLC Construction, LLC for $100,895, Division 2 awarded to Caldwell Tanks Inc. for $693,200 and Division 3 awarded to Pittsburg Tank & Tower Company, Inc. for $84,678. Total award amount is $878,773..** Division 1 - Water Main: Furnish all labor, materials, equipment, and incidentals to construct and complete water main improvements to the new elevated storage tank, including but not limited to the following approximate quantities: Traffic Control and Mobilization - Lump Sum; Granular Surfacing 130 TONS; Seeding Lump Sum; Field or Drain Tile Lines 50 LF; Sewer Service Replacement 50 LF; Water Main in Place, 8 DIP 178 LF; 8 PVC 305 LF; 8 Gate Valve 4 EA; 8 Valve and Sleeve 1 EA; Connection to Existing Main Connection No. 1 Lump Sum; Connection No. 2 Lump Sum; Service Connection 5 EA; Hydrant and Valve 1 EA; and miscellaneous associated work. Division 2 Elevated Storage Tank: Furnish all labor, materials, equipment and incidentals to construct and erect a new multi-column 75,000 gallon elevated storage tank with 112 feet to high-water-level, including but not limited to the following: Traffic Control, Mobilization and Design Lump Sum; Foundation Lump Sum; Fabrication and Erection Lump Sum; Surface Preparation and Coating Lump Sum; Site Work and Piping- Lump Sum; and miscellaneous associated work. Division 3 Elevated Storage Tank Demolition: Furnish all labor, materials, equipment and incidentals to demolish and dispose of an existing 50,000 gallon elevated storage tank, and miscellaneous associated work. Each bidder shall accompany its bid with bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to the City, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bidder s security shall be in the amount of 10% of the amount of the bid, as fixed in the Instruction to Bidders and shall be in the form of a cashiers check or a certified check drawn on a FDIC insured bank in Iowa or on a FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the City. The bid shall contain no condition except as provided in the specifications. Division 1 - within 30 working days; NOTICE TO PROCEED will be issued no later than September 9, 2024. Milestone 1: all work, excluding Milestone 2 within 25 working days. Milestone 2: Connection 1 - Phase 2 within 5 working days after new elevated storage tank is operational. Division 2 - on or before June 20, 2025. Division 3 - on or before August 1, 2025. Successful Bidder will be required to furnish Performance, Payment and Maintenance Bond acceptable to the City of Hedrick on the form provided in the specifications in amounts equal to one hundred percent (100%) of the contract price.. Div 1: $93,010 Div 2: $825,500 Div 3: $38,000 Total: $956,510 Preference shall be given to domestic construction materials by the contractor, subcontractors, materialmen, and suppliers in performance of the contract. $700 per working day that the work is not fully complete. The City of Hedrick reserves the right to reject any and all bids. Low Bids: Division 1: Low: KLC Construction $100,895 2nd: G & R Miller Construction $109,179 Division 2: Low: Caldwell Tanks $693,200 2nd: Maguire Iron $840,900 3rd: Phoenix Fabricators $912,641 4th: Pittsburg Tank $1,016,094 Di

Award

Water / Sewer

$878,773.00

Public - City

Site Work

8

23

2

6

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Cast Decks and Underlayment, Concrete Topping
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Wall Finishes, Stone Facing, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Plugging, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
34
Bidding Soon
494
All Active Projects
180
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

September 9, 2024

img_map_placeholder

Multiple Locations, Hedrick, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.