BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2024 at 8:00 PM

Updated March 22, 2024

Site work for a civil project in Tonto Basin, Arizona. Completed plans call for site work for a bridge / tunnel; and road / highway.

Project was awarded to HT4 in the amount of $384,093.84, Gila County is requesting bids from qualified Contractors to construct a new 2-barrel, reinforced concrete box culvert in Punkin Center, AZ according to the specifications and plans. Any questions regarding this request for bids shall be submitted in writing and directed to: Betty Hurst, Contracts Administrator, at bhurst@gilacountvaz.gov, (928)402-4355. The Board of Supervisors reserves the right to reject any or all bids, or to accept any bid, or to waive any informality in any bid, or to withhold the award if deemed in the best interest of Gila County. All procurement activities conducted by Gila County are in conformance with the rules and regulations of the Gila County Procurement Code. A copy of the code is available for review in the Clerk of the Board's office, Globe, AZ. Any questions regarding this request for bids shall be submitted in writing and directed to: Betty Hurst, Contracts Administrator, at bhurst@gilacountyaz.gov, (928)402-4355. The proposed work is located in the unincorporated community of Punkin Center in the western part of Gila County. The work forthis improvement project will be performed along Walnut Springs Blvd, at Walnut Canyon just south of Four Peaks Rd. The work consists of removing existing 5 each 36-inch pipes and.constructing a new 2-barrel, 10-foot by 6-foot reinforced concrete box culvert. The work also includes grading, paving, placing riprap, seeding and other incidental work as shown on the project plans (see APPENDIX A) and as described in the Special Provisions. The Gila County project of Walnut Springs Blvd, is located in the community of Punkin Center, Arizona (aka Tonto Basin). It is one block west of State Route 188 just south of Four Peaks Road. Walnut Springs Blvd, is impassable where the culverts washed out. Questions received after 3:00 P.M., Wednesday January 24, 2024, will not be answered. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Award

Bridges / Tunnels

$384,094.00

Public - County

Site Work

13

6

8

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
39
Bidding Soon
1,068
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

March 4, 2024

Project location map

Walnut Springs Blvd, Tonto Basin, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.