Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition and site work for a municipal facility in Winnipeg, Manitoba. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.
The Work to be done under the proposed Contract shall consist of the small building demolition in City owned and/or operated buildings at the direction of the Contract Administrator for the period from date of award to February 28, 2028. Level I Demolition The Work to Be Done Under the Subsequent Contract Shall Consist of the Demolition of Small Buildings. (a) the Work Shall Be Done on an as Required Basis During the Term of the Contract. (I) the Type and Quantity of Work to Be Performed Under This Contract Shall Be as Authorized From Time to Time by the Contract Administrator and/or Users. (Ii) the City Shall Have No Obligation Under the Contract to Purchase Any Quantity of Any Item in Excess of Its Actual Operational Requirements. (B) the City Will Have Arranged to Have the Gas and Hydro Connections Disconnected and Meters Removed by Others. (C) the City Reserves the Right to Add or Delete Contractors During the Period Stated in D2.1 in the Best Interest to the City. (D) Demolitions Shall Be Performed in Accordance With (Canadian Standards Association (Csa International) Standard; Csa S350-m1980 (R2003), Code of Practice for Safety in Demolition of Structures. (E) Contractors Shall Obtain the Necessary Service Permits From the Citys Public Works Department, Cut-off and Abandoned All Existing Sewer and Water Pipes, Including Having Arranged for an Inspection of the Cut-offs by the Citys Water and Waste Department Level Ii Wet Demolition The Work to Be Done Under the Proposed Contractor Shall Consist of Wet Demolitions of Small Buildings. (a) the Work Shall Be Done on an as Required Basis During the Term of the Contract. (I) the Type and Quantity of Work to Be Performed Under This Contract Shall Be as Authorized From Time to Time by the Contract Administrator and/or Users. (Ii) the City Shall Have No Obligation Under the Contract to Purchase Any Quantity of Any Item in Excess of Its Actual Operational Requirements. (B) the City Will Have Arranged to Have the Gas and Hydro Connections Disconnected and Meters Removed by Others. (C) the City Reserves the Right to Add or Delete Contractors During the Pre-qualification Period in the Best Interest to the City. (D) Demolitions Shall Be Performed in Accordance With (Canadian Standards Association (Csa International) Standard; Csa S350-m1980 (R2003), Code of Practice for Safety in Demolition of Structures. (E) Contractor Shall Obtain the Necessary Service Permits From the Citys Public Works Department, Cut-off and Abandoned All Existing Sewer and Water Pipes, Including Having Arranged for an Inspection of the Cut-offs by the Citys Water and Waste Department. (F) the Trees on Site Must Be Protected According to the Citys tree Protection During Construction Specifications. These Specifications Can Be Found on the City (G) Use Wet Demolition Procedures When the Building is Deemed Unsafe to Enter and Asbestos Containing Materials or Other Hazardous Materials Are Suspected to Be in the Building to Be Demolished. The Major Components of This Work Include: (I) Demolishing the Building in a Controlled Manner Using Proper Asbestos Removal Procedures. (Ii) Control Any Water Runoff. (Iii) Provide Temporary Dust Screens, Covers, Railings, Support or Other Protection as Required. (Iv) Follow All Safety Procedures Outlined by the Authorities Having Jurisdiction. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Post-Bid
Municipal
$50,000.00
Public - City
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
January 26, 2024
February 26, 2024
Multiple Locations, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Jan 17 2024
Winnipeg, MB
Bid Date: Feb 14 2024
Winnipeg, MB
Bid Date: Jan 09 2024
Winnipeg, MB
Bid Date: Feb 09 2024
Winnipeg, MB
Bid Date: Feb 16 2024
Winnipeg, MB
Bid Date: Mar 08 2024
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Jan 22 2024
Winnipeg, MB
Bid Date: Jan 23 2024
Winnipeg, MB
Bid Date: Jan 11 2024
Winnipeg, MB
Bid Date: Feb 06 2024
Winnipeg, MB
Bid Date: Feb 06 2024
Winnipeg, MB
Bid Date: Jan 23 2024
Winnipeg, MB
Bid Date: Jan 19 2024
Winnipeg, MB
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--