Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Asheville, North Carolina. Completed plans call for the renovation of a educational facility.
Remove existing water heater and tank and install two (2) HTP Phoenix Model PH199-119 modulating, high-efficiency, condensing gas-fired water Question Deadline 01/15/2024 at 5:00 PM ET Please direct all project related RFP questions to Chad Allen, Project Manager. Questions should be submitted via email to chad.allen@bcsemail.org Contractors are hereby notified that they must have proper license under the State laws governing their respective trades and that North Carolina General Statute 87 will be observed in receiving and awarding contracts. General Contractors must have general license classification required by this project. No bid may be withdrawn after the opening of bids for a period of thirty (30) days. Buncombe County Schools reserves the right to reject any or all bids and waive informalities. Bids shall be made on the Bid/Acceptance form provided herein with all blank spaces for bids properly filled and all signatures properly executed. Work shall consist of furnishing all labor, materials, equipment, permits, and servicing, incidental and implied, for the completion of a working system as designed per the attached specifications. Remove the existing water heater/boiler and tank; all unused piping, electrical components, and wiring not needed for the operation of the new water heaters. Onsite dumpsters shall not be used. Modify or construct 6" concrete pads at the location of the new water heaters if none are present. Install (2) HTP Phoenix Model PH199-119 Modulating, High Efficiency, Condensing gas-fired water heater. (per manufacturer recommendations) Extend the gas line to new water heaters. Shut off valve and line pressure regulators to be included. (gas line shall be painted yellow and labeled) All pumps, piping, valves, venting, and insulation shall be included. All new pipes are to be insulated with fiberglass insulation. Replace the expansion tank (If needed). The tank shall be installed off the ground. An Apollo ball valve shall be installed between the water heater and the expansion tank. All wiring, accessories, and disconnects shall be included. All exposed low-voltage wiring shall be in rigid conduit. Add HTP Modbus/ Bacnet gateway/adapter to allow BAS to communicate with the water heaters. (the owner will perform control wiring and integration) Factory Start-up, Adjustment, and Combustion test reports shall be part of this contract. One paper copy and two digital copies on a USB (thumb) drive of the completed factory start-up sheet, installation, operation and maintenance manuals shall be delivered to the owner before final payment will be made. All old equipment, piping, wiring, and venting no longer needed shall be removed Specifications: HTP Phoenix Model PH199-119 Modulating, High Efficiency, Condensing gas-fired water heater 40 to 199 MBH Input 119-gallon storage capacity 237 GPH @ 100 deg. F. rise (335 Gallons @ 100 deg. F. rise First Hour Rating) Complete with: Up to 96.1% Efficiency FULL MODULATION, 5:1 turndown Sealed Combustion Factory assembled & fire tested Low NOx rating 316L stainless steel tank Polyurethane foam insulation High-impact plastic jacket Removable front cover 90/10 Cupronickel & SS heat exchanger Pre-mix stainless steel burners T&P Relief valve Self-diagnostic electronic control Digital display 70 to 160 deg. F. Operating Range Upper & lower temperature sensors High limit safety Low water cutoff Direct spark ignition Condensation trap assembly Intake/exhaust via PVC pipe UN/ULC/ANSI approved BACnet card shall be included Buncombe County Schools-RFP 18.23 Page 17 of 28 Made in the USA
Bid Results
Educational
$56,940.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 1, 2024
February 23, 2024
275 Overlook Rd, Asheville, NC
Related To This Project
Asheville, NC
Bid Date: Feb 01 2024
Asheville, NC
--
Asheville, NC
Bid Date: Jan 17 2024
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
Bid Date: Jan 05 2024
Asheville, NC
--
Asheville, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.