BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Walpole, Massachusetts. Completed plans call for site work for a water / sewer project.

As of February 15, 2024 project is not awarded yet. Underground Storage Tank Removal for the Norfolk County Agricultural High School For technical questions contact Peter Murphy, Director of Facilities, pmurphy@norfolkaggie.org For questions pertaining to bidding procedures, contact Nancy R. Rockwell, Chief Procurement Officer at purchasing@norfolkcounty.org. Work will begin on June 17, 2024. II. SCOPE OF WORK 1A. B.l Administration Building UST Removal 7 o Notify dig safe as required by law. o Mobilize equipment to the site and demobilize at the completion of the proposed work. o Prevailing wage applies to this project. o Work must comply with all state and local regulations. o Must have any applicable licenses in good standing. o Contractor will be responsible for obtaining appropriate permits. o Work site protection and operations will be performing in accordance with applicable OSHA standards and practices. o Install construction fence around work site. o Saw cut asphalt o Removal and disposal of asphalt as needed for tank removal o Remove bushes and dispose. o Remove concrete walkway, replace with asphalt and install 30ft of granite curbing on south side of excavation. o Excavate around existing fuel tank o Stockpile excavated soils o Cover stockpiled soils with 10 mil poly o Cut 2 holes in top of fuel tank o Clean sludge from bottom of fuel tank o Disposal of up to 50 gallons of sludge from bottom of tank o Removal and disposal of fuel tank and piping, (5000 gallon tank). o Install stock piled excavated soils o Import clean soils to complete backfilling. o Compact all backfilling. o Install dense grade for asphalt base o Install 2" hot mix asphalt binder course INVITATION FOR BID FOR REMOVAL OF UNDERGROUND STORAGE TANKS FOR THE NORFOLK COUNTY AGRICULTURAL HIGH SCHOOL IB. B.9 Plant Science UST Removal IC. B.9 Plant Science UST Removal and Replacement (Generator Tank) 8 o Install construction fence around work site. o Saw cut asphalt. o Removal and disposal of asphalt as needed for tank removal. o Remove bushes and dispose. o Excavate around existing fuel tank. o Stock pile excavated soils o Cover stockpiled soils with 10 mil poly o Cut 2 holes in top of fuel tank o Install construction fence around work site. o Saw cut asphalt. o Removal and disposal of asphalt as needed for tank removal. o Remove bushes and dispose. o Remove remaining fuel. o Excavate around existing fuel tank. o Stockpile excavated soils o Cover stockpiled soils with 10 mil poly o Cut 2 holes in top of fuel tank. o Clean sludge from bottom of fuel tank o Disposal of up to 50 gallons of sludge from bottom of tank o Removal and disposal of fuel tank and piping, (8000-gallon tank). o Install stockpiled excavated soils o Import clean soils to complete backfilling. o Compact all backfilling. o Install dense grade for asphalt base o Install 2" hot mix asphalt binder course o Install 11/2" hot mix asphalt top coat o Return excavated area to proper grade, pave entire area. o Vent pipe for tank on the side of Building #9 must be removed and concrete repaired following removal. o Connections within Building #9 boiler room must be terminated and lines removed. o Protect storm drain from contamination and debris. o Install 11/2" hot mix asphalt top coat o Return excavated area to proper grade, pave entire area. o Vent pipe for tank on the side of Building #1 must be removed and concrete repaired following removal. o Protect storm drain from contamination and debris. o Clean sludge from bottom of fuel tank o Disposal of up to 50 gallons of sludge from bottom of tank o Removal and disposal of fuel tank and piping, (500-gallon tank). o Install stockpiled excavated soils o Import clean soils to complete backfilling. o Compact all backfilling. o Install dense grade for asphalt base o Install 2" hot mix asphalt binder course o Install 11/2" hot mix asphalt top coat o Return excavated area to proper grade, pave entire area. o Vent pipe for tank on the side of Building #9 must be removed and concrete repaired following removal. o New aboveground fuel storage tank to be installed and connected; Containment Solutions Gen Cube Tank, (200 gallons). o Ensure proper operation of generator following the connection with the new fuel tank. o Protect storm drain from contamination and debris.

Award

Water / Sewer

$59,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
158
Bidding Soon
2,903
All Active Projects
1,180
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2024

June 17, 2024

img_map_placeholder

400 Main St, Walpole, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.