EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 2, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Hartford, Connecticut. Completed plans call for the renovation of a municipal facility.

The Project Manager is the authorized representative for the State of Connecticut Judicial Branch. Project Manager to act in matters involving revoking, altering, enlarging or relaxing any requirement of the contract documents. The Project Manager will process all requests for information, interpretations and decisions regarding the meaning and intent of the Contract Documents, consulting with appropriate parties prior to rendering the interpretations or decisions for the Owner to the Contractor. All such requests and replies shall be in writing. ALL work is to be substantially completed and ready within 45 calendar days Project scope includes but is not limited to the following: 1. INSTALLATION OF NEW SUPPORT FOOTINGS. 2. ERECTION OF NEW SUPPORT STEEL. 3. CONSTRUCTION OF A NEW CONCRETE FLOOR ON METAL DECK. 4. REMOVAL OF EXISTING SHORING. 5. CORING THROUGH SLAB FOR NEW UTILITIES. 6. CONSTRUCTION OF TEMPORARY PROTECTION OVER EXISTING WATER AND GAS LINES LOCATED OUTSIDE THE BOILER ROOM. 7. REMOVAL OF TEMPORARY CONSTRUCTION FENCE TO BE RETURNED TO THE STATE. 8. REMOVAL OF ANY TEMPORARY DUST PROOF PARTITIONS. 9. Refer to the Contract Drawing package entitled Boiler Room Repairs, as prepared by Macchi Engineers, LLC for more specific information and details on project.

Bid Results

Municipal

$144,900.00

Public - State/Provincial

Renovation

5

8

8

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Quantity Allowances, Payment Procedures, Schedule of Values, Quality Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Site Maintenance, Starting and Adjusting
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
649
Active Projects
385
Bidding Soon
4,934
All Active Projects
2,344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

March 1, 2024

img_map_placeholder

80 Washington St, Hartford, CT


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Boiler Room Repairs Slab Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.