BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Los Angeles, California. Working plans call for the construction of a 450,000-square-foot medical facility; and for site work for a medical facility.

The U.S. Army Corps of Engineers (USACE), Los Angeles District (SPL) has an announcement regarding its intent to use a Triple Friction Pendulum (TFP) isolation system in the final design of a new project to construct a New 450,000 GSF Critical Care Center on West Los Angeles VA Campus of the Greater Los Angeles Veteran Affairs Healthcare System (GLAVAHS) in Los Angeles CA. This project is expected to be over $500M. There are only two types of isolation systems, Lead Rubber Bearing (LRB) and Triple Friction Pendulum (TFP), capable of satisfying the government requirements. Based upon the details contained in the designer's Structural Basis of Design Narrative and Base Isolation Comparison Narrative, the government intends to further develop its design based on using a TFP System. Critical Care Center Project Scope This project scope is for a new 450,000 GSF Critical Care Center, new Central Utility Plant, Selective Renovation of Building 500, and the related site utilities, at the West Los Angeles VA Medical Center in Los Angeles, CA. The new facility will include a mental health ward, surgery suites, pre-operative services, PACU, ICU, Anesthesiology and all support functions for surgery, pharmacy, in-patient intake, radiology, Pathology, Morgue, Central Sterilization, EVS/EVS, and Emergency care service. The facility will have 160 beds of which 44 will be in the mental health ward. The location of the new Critical Care Center will be just south of the current Hospital, Building 500. This project will be constructed to meet U.S. Green Building Council LEED Silver version 4 standards. Submission request to demonstrate capabilities for this project include: Enclosed with this notice are two documents 1) Structural Basis of Design Narrative and 2) Base Isolation Comparison Narrative, which form the basis of the government's intent to use the TFP System. The main criteria considered include displacement, accelerations, fire rating, base shear, building periods, and self-centering. The primary emphasis being the ability of the system to minimize structural and non-structural damage during an earthquake and to maintain full functionality of the building during and after an earthquake to the facility. Interested parties are encouraged to provide information for consideration if another system can achieve better results than those indicated in the enclosed documents. Responses to this notice are due no later than January 31, 2024. Please direct your responses by e-mail to james.m.costantino@usace.army.mil.

Final Planning

Medical

$500,000,000.00

Public - Federal

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
96
Bidding Soon
2,182
All Active Projects
966
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2024

img_map_placeholder

11301 Wilshire Blvd, Los Angeles, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.