BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2024 at 7:00 PM

Updated February 23, 2024

Site work and paving for a mixed-use development in Evanston, Wyoming. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Water Main Looping Project. Est. Completion Date: Aug. 12, 2024. Question Deadline Feb 17, 2024 The work shall include all labor, material, equipment, testing, disinfection, and quality assurance necessary to complete the turnkey project which includes the replacement of an existing water main with 2010 L.F. of 12" diameter C-900 pipe and approximately 50 L.F. of 6" diameter C-900 pipe related to hydrant installations. Three fire hydrants with auxiliary valves, restrained joints, fittings, valves, and thrust blocks. The work also includes but is not limited to all incidental items required for the system to be installed to the material manufacturer's requirements and contract documents. At some locations, the existing ductile iron water main will be removed and replaced, and in others, the existing main will be abandoned in place and a new parallel pipe installed. The route is under asphalt pavement and areas of reinforced concrete flatwork, sidewalks, curbs, and gutters as quantified in the Bid Form. All surfaces are to be patched back with the same materials. See Special Provision SP001010 for more information. Each Bidder will be required to submit, with their bid, a certified check, or Bid Bond made payable without condition to the Uinta County School District No. 1 in the amount of not less than five percent (5%) of the Bidder's maximum Bid Price as a guarantee that such Bidder will enter into a contract within five (5) days after the date of the Owner's Notice of Award. Uinta County School District No. 1 and the City of Evanston reserve the right to reject any or all bids, or any part of any bid, to waive any formality in any bid, as its best interest may appear. Site Address: 701 West Cheyenne Drive Site Directions: Located along the backside of Evanston High School between Bodine Drive and West Cheyenne Drive

Post-Bid

Water / Sewer

$1,000,000.00

Public - County

Paving, Site Work

4

9

32

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
69
Bidding Soon
1,045
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

April 22, 2024

Project location map

701 W Cheyenne Dr, Evanston, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.