BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2024 at 7:00 PM

Updated January 29, 2024

Site work for a water / sewer project in Twisp, Washington. Completed plans call for site work for a water / sewer project.

Work is divided between two (2) bid schedules under one (1) contract. Schedule A: Pipeline Relocation on SR-20 at Olson Creek Project Installation of approximately 610 linear feet of16-inch HDPE casing byhorizontal direction drill,installation of approximately 610 linear feet of8-inch fused PVC C900carrier water pipeline under Olson Creek, as wellas installation of approximately 290 linear feet of8-inch PVC water pipeline by traditional trenching methods along StateRoute 20, east of RangerStation Road, Marblemount, State of Washington. Work includes valves,fittings, traffic control, andpressure and purity testingof the pipe, along with incidentals and appurtenances, such as casing spacers, end seals, grouting,dewatering, in estimatedquantities identified in theBid Proposal. Schedule B: Pipeline Relocation at SR-9 North ofKalloch Road Project Installation of approximately 500 linear feet of16-inch HDPE casing byhorizontal direction drill,installation of approximately 500 linear feet of8-inch fused PVC C900carrier water pipeline under a tributary of HansenCreek along State Route9, north of Kalloch Road,Sedro-Woolley, Stateof Washington, including valves, fittings, trafficcontrol, and pressure andpurity testing of the pipe,along with incidentals andappurtenances such ascasing spacers, end seals,grouting, dewatering, inestimated quantities identified in the Bid Proposal. This project is partiallyfunded by a Local andCommunity Projects Grantthrough the Washington State Department ofCommerce. Skagit PUDis an equal opportunityemployer. Procurementand contracts are administered without discrimination based on race, col- or, sex, or national origin.Disadvantaged BusinessEnterprises have an equalopportunity to competefor and participate in theperformance of all agree- ments, contracts, andsubcontracts awarded bySkagit PUD or its contractors, and are encouragedto submit. Any requests for information or interpretation of the Bid Documents shall be made by phone or email to Catherine Price, Contract Coordinator (360) 848-4472 or Price@SkagitPUD.org. All such requests shall be received no later than three (3) days prior to bid opening.

Bid Results

Water / Sewer

$800,531.00

Public - County

Site Work

18

14

12

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
8
Bidding Soon
182
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

March 18, 2024

Project location map

State Rte 20, Twisp, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.