BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Waldorf, Maryland. Completed plans call for site work for a water / sewer project.

Small, Local, and Minority Business Enterprises are encouraged to respond to this solicitation. The County Commissioners reserve the right to reject any or all bids and to waive any informality in the bids received when such a waiver is in the best interest of Charles County. Charles County Government is an Equal Opportunity Employer. The Board of Commissioners for Charles County are hereby requesting sealed bids from qualified contractors to drill, construct, develop, and test the new Mattawoman-Beantown production well. There is an aspirational goal of 25% MWBE participation for each project. The site of the proposed new Mattawoman-Beantown production well is located west of the intersection of Mattawoman Drive and Mattawoman-Beantown Road in Waldorf, Maryland The primary purpose of the project is to drill, construct, develop, and test the new Mattawoman-Beantown production well which generally includes the following: A. Mobilization B. Erosion and Sediment Control Measures C. Drill Pilot Hole D. Construct, Develop, and Test New Production Well E. Furnish and Install Baker Monitor Pitless Unit F. Offsite Disposal of Drilling Fluids G. Demobilization and Site Restoration Time of Completion - (180) consecutive calendar days The work under this Contract includes all requirements to provide a fully finished and operable water well, including miscellaneous items and incidentals as shall be indicated, shown, specified or required to complete the work in strict conformity with the Contract Documents. 1. The Contractor shall provide all labor, equipment, tools, appliances, materials and incidentals, and shall perform all operations required to completely finish all of the work to the satisfaction of the Owner and the Engineer. The Contractor shall be obligated to furnish a complete and functioning facility, or the portion of the facility that they have been selected to complete. 2. The Contractor shall drill, develop and test the new production well and install the new pitless unit in accordance with the Contract requirements to achieve Substantial Completion. 3. Installation and testing of the permanent pumping equipment and abandonment of the existing production well is not included in Contract.

Bid Results

Water / Sewer

$685,700.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
95
Bidding Soon
2,061
All Active Projects
822
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

March 11, 2024

img_map_placeholder

12599 Mattawoman Dr, Waldorf, MD

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.