Site work for a water / sewer project in Orlando, Florida. Completed plans call for site work for a water / sewer project.

**As of April 22, 2024 this project has not yet been awarded. A timeline for award has not yet been established. This provision exists solely for the convenience and administrative efficiency of Orange County. No respondent or other third party gains any rights by virtue of this provision or the application thereof, nor shall any respondent or third party have any standing to sue or cause of action arising there from. Untimely questions are unable to be submitted in the question and answer module, thereafter respondents raising critical concerns must email gian.otero@ocfl.net. Critical clarifications may be made via addenda, however, untimely questions may not be considered. Question Deadline 01/22/2024 at 5:00 PM ET The question and answer module of ProcureNow OpenGov IS being utilized for this solicitation. Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions . Respondents are instructed not to contact the initiating division directly. A Bid, Payment and Performance Bond Are a Requirement When the Offer/contract Amount Exceeds $100,000. Respondents Shall Attach an Electronic Copy of Their Bid Bond for Responsiveness. Submission of the Bid Bond, Along With a Certified and Effectively Dated Copy of the Power of Attorney, Shall Be Completed and Signed by All Required Parties and Submitted on the Form Provided in the Solicitation. Submittal of a Bid Bond Less Than 10% of the Total Estimated Contract Amount for Base Period, Shall Result in the Bid Being Deemed Non-responsive. In Order to Be Acceptable to the County, the Surety Company Issuing the Bid Bond Shall Meet and Comply With the Minimum Standards Described in #bond Requirements, "qualifications of Surety Companies". Failure to Submit a Bid Bond From a Surety Company Meeting These Minimum Standards Shall Result in Rejection of the Offer. Alternative Surety In the Alternative, a Certified Check, or a Cashier's Check Shall Be Required to Accompany Each Electronic Offer in a Stated Dollar Amount of Not Less Than Ten (10%) Percent of the Sum of the Total Estimated Contract Amount for the Base Period. Checks Shall Be Submitted to the Procurement Division; Internal Operations Centre Ii, 400 E. South Street; 2nd Floor, Orlando, Fl 32801 on or Before the Submission Deadline of 4:00 Pm Est, Tuesday, February 6, 2024. Respondent's Must Indicate on the Outermost Sealed Envelope the Following: 1. Force Main East Area Package 4 (Y24-746) 2. Deadline: Tuesday, February 6, 2024. 3. Name of Respondent 4. Return Address of the Respondent Submittal of a Certified Check, or a Cashier's Check in an Amount Less Than Ten (10%) Percent Shall Result in Rejection of the Proposal. Certified Checks or Cashier's Checks Shall Be Drawn on a Solvent Bank or Trust Company to the Order of the Board of County Commissioners, Orange County, Florida and Shall Have All Necessary Documentary Revenue Stamps Attached, if Required by Law. Personal Checks Shall Not Be Accepted and Shall Result in Rejection of the Proposal. Failure to Submit Alternative Surety Prior to the Submission Deadline Of4:00 Pm Est,tuesday, February 6, 2024 Shall Result in Rejection of the Entire Proposal (Electronic Submittal). The Time/date Stamp Clock Located in the Procurement Division Shall Serve as the Official Authority to Determine Lateness of Any Alternative Surety. Checks Received After the Stated Deadline Will Be Returned Unopened. 2.12. Minority and Women Owned Enterprise Requirements Scope of Services / Specifications 3.1. Location of Solicitation Documents Overview: The Purpose of This Project is to Remove and Replace Approximately 6,217 Lf of 4-inch and 3,445 Lf of 12-inch Force Mains. Grout and Abandon Force Main Under Pavement. Connect Existing Pump Stations (Public & Private) to New Force Main. This Contract is for Execution of the East Orlando Force Main R&r - Package #4 Project, as Shown on the Drawings and Specified Herein. The Work Consists of Furnishing All Labor, Equipment, and Materials for the Construction of the Facilities Consisting of, but Not Limited to the Following: 1. Furnish and Installing the Following Section of Pipe: Conway/judge Rd + 3,845 Linear Feet of 4-inch Diameter Sanitary Sewer Force Main Reddit Road + 3,445 Linear Feet of 12-inch Diameter Sanitary Sewer Force Main + 52 Linear Feet of 4-inch Diameter Sanitary Sewer Force Main Watts Ave/gondola Dr + 2,305 Linear Feet of 4-inch Diameter Sanitary Sewer Force Main Appurtenances, and Miscellaneous Work and Incidental Items, as Shown on the Drawings. 2. Assist the County With Pipe Sampling as Detailed Herein. 3. Coordination With the County for Flow Diversion During Construction. 4. Required Pavement and Concrete Removal and Replacement to Complete the Utility Installation Work. 5. Removal and Replacement of Various Stormwater Pipe and Structures as Shown on the Drawings. 6. Development and Execution of a Maintenance of Traffic (Mot) Program, Including Submittal of Said Mot Permit Application and Related Documents for Approval by the County and City of Belle Isle. 7. Trench Excavation, Backfill, and Compaction for Underground Utilities. 8. Abandonment/removal of Existing Force Main Piping as Detailed in the Drawings and Herein. 9. Testing of Installed Systems. 10. Restoration and Clean-up of All Disturbed Areas. Location 1: St Partin Pl, Waters Edge Dr, Conway Lakes Dr, Judge Rd , Conway Rd Location 2: Reddit Road Location 3: Watts Ave/Gondola Driv

Bid Results

Water / Sewer

$3,529,630.00

Public - County

Site Work

64

16

10

6

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
354
Active Projects
162
Bidding Soon
2,681
All Active Projects
1,070
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 22, 2024

April 24, 2024

April 21, 2025

img_map_placeholder

Multiple Locations, Orlando, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.