BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, asbestos abatement and renovation of an educational facility in Battle Creek, Michigan. Completed plans call for the renovation of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

RFIs Due: 1/17/2024 4:00 p.m. If you have any questions concerning this report, please do not hesitate to call me at 231-250-9343. This is an asbestos remediation project at Verona Elementary that is taking place prior to a scheduled HVAC Renovation Project. 1. Quantities listed are estimates only. The contractor is responsible for verifying actual quantities that will be removed. 2. All personnel on the work site must pass the Battle Creek School system background check. 3. The successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and related acts (prevailing wage). 4. All painted surfaces contain heavy metals. Lead-safe work practices should be utilized during your work. 5. Work completed while school is occupied shall be completed on second shift. 6. Abatement is scheduled to start after March 22nd, 2024. 7. Contract award preference may be given to the Contractor with shorter schedule duration. The Contractor shall furnish bonds covering faithful performance of the Contract and payment of obligations arising thereunder. Bonds may be obtained through the Contractor's usual source and the cost thereof shall be included in the Contract Sum. The amount of each bond shall be equal to 100% of the Contract Sum. The Contractor shall deliver the required bonds not later than three days following the date the Agreement is entered into, or if the work is to be commenced prior thereto in response to a Letter of Intent, the Contractor shall, prior to the commencement of the work, submit evidence satisfactory to the Owner that such bonds will be furnished. Include the costs of Payment Bonds and Performance Bonds in the base bid if the bid is over $50,000 and include the amount for bonds as an alternate in the base bid is under $50,000. Bid Bond or certified check of not less then 5% of the bid amount shall be submitted with bid and made payable to Battle Creek Public Schools.

Post-Bid

Educational

$100,000.00

Public - City

Asbestos Abatement, Renovation, Site Work

9

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
66
Bidding Soon
828
All Active Projects
350
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2024

March 22, 2024

img_map_placeholder

825 Capital Ave NE, Battle Creek, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.