Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 7, 2024 at 7:00 PM
Updated February 8, 2024
Renovation of an educational facility in Omaha, Nebraska. Completed plans call for the renovation of a educational facility.
The gym lighting system at Russell Middle School is in need of replacement. The project includes removal of the existing gym lighting system, equipment and cabling and replacing it with a new LED lighting system and lighting controls. Lighting and controls in the adjacent commons area is to be replaced as part of an alternate bid. Any questions concerning clarification of this bid should be directed to: Jeff Hemje , Morrissey Engineering 4940 North 118th Street Omaha, Nebraska 68164 Phone: (402) 491-4144 jhemje@morrisseyengineering.com A. The gym lighting system at Russell Middle School is in need of replacement. The project includes removal of the existing gym lighting system, equipment and cabling and replacing it with a new LED lighting system and lighting controls. Lighting and controls in the adjacent commons area is to be replaced as part of an alternate bid. B. Work under this contract includes all material, labor, tools, expendable equipment, utility and transportation services, and all incidental items necessary to perform and complete, in a workmanlike manner, the work required for the construction of the Russell Middle School gym lighting replacement. C. Work in the facility shall be allowed after normal student classroom hours during the school year and all hours during summer break. However, the contractor must provide, at all times, for clear exit paths, proper lighting, and fire/smoke protection (subject to approval of all authorities having jurisdiction) and protection against any and all fumes and odors caused by construction activities. The contractor shall halt or modify any activities the Owner determines to be disruptive in any manner to their continued use of the building. 1. BASE BID SCHEDULE: General Contractor may start work on the interior renovations on Friday, May 24th, 2024 and will substantially complete the interior renovations construction work on or before July 28th, 2024. 2. Final Completion shall be on or before Friday, August 9th, 2024.
Award
Educational
$60,745.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 23, 2024
May 24, 2024
5304 S 172nd St, Omaha, NE
Related To This Project
Omaha, NE
Bid Date: Jan 25 2024
Omaha, NE
Bid Date: Jan 10 2024
Omaha, NE
Bid Date: Jan 10 2024
Omaha, NE
Bid Date: Jan 10 2024
Omaha, NE
Bid Date: Feb 21 2024
Omaha, NE
Bid Date: Jan 11 2024
Omaha, NE
--
Omaha, NE
Bid Date: Jan 23 2024
Omaha, NE
Bid Date: Jan 23 2024
Omaha, NE
Bid Date: Jan 18 2024
Omaha, NE
Bid Date: Jan 16 2024
Omaha, NE
Bid Date: Jan 25 2024
Omaha, NE
Bid Date: Jan 16 2024
Omaha, NE
Bid Date: Jan 04 2024
Omaha, NE
Bid Date: Jan 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
