BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Omaha, Nebraska. Completed plans call for the renovation of a educational facility.

The gym lighting system at Russell Middle School is in need of replacement. The project includes removal of the existing gym lighting system, equipment and cabling and replacing it with a new LED lighting system and lighting controls. Lighting and controls in the adjacent commons area is to be replaced as part of an alternate bid. Any questions concerning clarification of this bid should be directed to: Jeff Hemje , Morrissey Engineering 4940 North 118th Street Omaha, Nebraska 68164 Phone: (402) 491-4144 jhemje@morrisseyengineering.com A. The gym lighting system at Russell Middle School is in need of replacement. The project includes removal of the existing gym lighting system, equipment and cabling and replacing it with a new LED lighting system and lighting controls. Lighting and controls in the adjacent commons area is to be replaced as part of an alternate bid. B. Work under this contract includes all material, labor, tools, expendable equipment, utility and transportation services, and all incidental items necessary to perform and complete, in a workmanlike manner, the work required for the construction of the Russell Middle School gym lighting replacement. C. Work in the facility shall be allowed after normal student classroom hours during the school year and all hours during summer break. However, the contractor must provide, at all times, for clear exit paths, proper lighting, and fire/smoke protection (subject to approval of all authorities having jurisdiction) and protection against any and all fumes and odors caused by construction activities. The contractor shall halt or modify any activities the Owner determines to be disruptive in any manner to their continued use of the building. 1. BASE BID SCHEDULE: General Contractor may start work on the interior renovations on Friday, May 24th, 2024 and will substantially complete the interior renovations construction work on or before July 28th, 2024. 2. Final Completion shall be on or before Friday, August 9th, 2024.

Award

Educational

$60,745.00

Public - City

Renovation

5

8

2

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
65
Bidding Soon
868
All Active Projects
364
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 23, 2024

May 24, 2024

July 28, 2024

img_map_placeholder

5304 S 172nd St, Omaha, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.