BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in San Antonio, Texas. Completed plans call for site work for a road / highway.

As of March 5, 2024, this project has not yet been awarded. The project is expected to be awarded on March 12, 2024. Please submit all bid questions for the Q&A portal or to the Buyer/Contract Specialist, Jonathan Preiss, CTPM, jonathan.preiss@bexar.org Please submit all bid questions for the Borgfeld Drive at Blanco Road Traffic Signal project by Wednesday, January 24, 2024 at 4:00 p.m Bid, payment, and performance bonds are required. For additional information, contact David R. Wegmann, P.E., Bexar County Public Works, Engineering Services Manager, at (210) 335-6700. Note: Online bidding will open one week prior to bid opening. Scope of Work: o Limits: Within 600 feet of the intersection on each approach o Traffic signal construction at the intersection o ADA curb ramps on two corners of the intersection o Pavement Markings on all approaches o Replace, relocate or remove signs on each approach o Underground utilities shall be located and verified prior to beginning any construction work o Any request for modifications must be submitted in writing and approved by the Design Consultant & Bexar County Public Works o All work will be located within the existing Right-of-Way o Duration for Completion - Within 45 Working Days o Liquidated Damages - $700/Working Day o Schedule for Completion - One construction phase for the all traffic signal, ADA Ramps, Signing and Pavement Markings o Any request for modifications must be submitted in writing and approved by the Design Consultant & Bexar County Public Works o Traffic Control - Use Standard TxDOT Standard Traffic Signal Work Barricades and Signs Standards for TCP (WZ (BTS-1-2) -13 o Site Conditions: o Parking - Restricted to work area o Material storage requirements - Staging area is not shown on construction documents, Contractor's responsibility to determine location with Bexar County's approval Stockpiling shall not obstruct conveyance of any existing drainage path o Review all Governing Specifications and Special Specifications in the Project Manual o Karst Features - Bexar County and Engineer must be notified immediately if Karst features are encountered during construction and excavation activities o Protection of facilities and equipment o Contractor's Responsibility o Streets, property, and utilities damaged outside Project Area due to construction will be repaired at Contractor's expense o Protection of Overhead/Aerial Electric and Telecom, Underground Gas & Telecom, Underground Water and Sewer Facilities - Refer to Construction Plans "General Notes" Sheet 5. Utility locations shown on the plans are approximate and will be the Contractor's responsibility to notify the appropriate utility companies 72 hours prior to construction for better locations. o Working on site (noise, safety requirements, hours, etc.) o Monday through Friday (7:00 AM to 6:00 PM), Saturday's only with 72 hours approval from Bexar County staff. o Residential Area o Site Visit/Walkthrough - No formal site visit required, but we highly encourage you visit the site o Permitting - Contractor responsible for all permits (TCEQ permit, EPA, etc.)

Award

Roads / Highways

$304,364.00

Public - County

Site Work

52

9

7

7

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
263
Active Projects
140
Bidding Soon
3,410
All Active Projects
1,318
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 2, 2024

March 4, 2024

May 6, 2024

img_map_placeholder

Borgfeld Dr & Blanco Rd, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.