BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Watrous, New Mexico. Completed plans call for the renovation of a playground / park / athletic field.

Foun-generator Replace: Quarters 3a Replacement of 26 KW Propane Standby Generator Location at FOUN, Watrous, NM Install 26 KW Standby Generator The emergency Backup Standby Generator provides a vital role in the park and will provide backup power to the Quarters Unit 3A during a power outage. In the event of a power failure, the Standby Generator will provide heating for the unit and backup for all other electrical needs. The contractor's responsibility is to provide a replacement equal to or the same as the kind of equipment with the installation of a 26 KW Propane Standby Generator and all wiring and piping as needed. The contractor will use the existing transfer switch. The contractor will provide a pre-cast Concrete Pad for placement of the generator. Installation will be completed during business hours Monday through Friday from 7:00 AM through 4:00 PM. Questions due NLT Jan 10 2024, 1:00PM ET. Delivery: 05/31/2024

Post-Bid

Playgrounds / Parks / Athletic Fields

$60,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
14
Bidding Soon
185
All Active Projects
78
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 19, 2024

February 19, 2024

img_map_placeholder

3115 NM-161, Watrous, NM


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.