BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Huntington, West Virginia. Conceptual plans call for the renovation of a medical facility.

Page 1 of 3 STATEMENT OF WORK Loading Dock Door Repair Hershel Woody Williams VAMC PART A GENERAL INFORMATION INTRODUCTION The Hershel Woody Williams VAMC located at 1540 Spring Valley Drive, Huntington WV, 25704 needs to repair the loading dock door on the ground floor of building 2. BACKGROUND The loading dock door on the ground floor near laundry services has been inoperable for about one month. It is in need of repair. SCOPE OF WORK Vendor will provide all services, parts or equipment to repair the loading dock door. WORK REQUIREMENTS Tasks to be accomplished: Vendor will provide all parts or equipment to repair the loading dock door which includes the following services: Furnish and install one 2401 drive system, drive belt and function control assembly for the loading dock door Replace the existing motion sensors to motion/safety sensor Vendor will provide services within 14 days upon contract award All materials shall be brought to 1540 Spring Valley Drive, Huntington, WV. Delivery vehicles shall keep traffic disruptions to a minimum. Use of any other entry points must be approved by Chief, Engineering Service prior to use. Vendor shall deliver required parts or equipment specified above during approved work times. Approved work times for this job shall be normal working hours of 8AM 430PM SUPPORTING INFORMATION Place of Performance for repair: Hershel Woody Williams VAMC 1540 Spring Valley Drive Huntington, WV 25704. Period of Performance The Contractor shall perform all deliveries normal business hours, as stipulated earlier. Special Considerations Contractor Furnished Materials All labor, materials, equipment to perform the job. When furnish , provide , install , or similar term is used it shall mean a complete installation, ready for use. The vendor shall supply all parts, equipment, material and labor to perform the work described above. The work will include all items as described in the Scope of Work listed above. Government Furnished Materials and Services. Government furnished property, if any, will be identified and will only be used for the performance of this contract unless otherwise authorized by the Contracting Officer. The Contractor shall, at all times, take any and all steps necessary for maintenance and preservation of all Government-furnished property. The Contractor shall comply with all reasonable requests of the Contracting Officer to enclose, or specifically protect, Government-furnished property. Qualifications of Key Personnel Contractor s employees should be knowledgeable of standards associated with this type work. Supervision/Communications. At all times during the performance, the Contractor s Superintendent (if applicable) shall be available by cellular phone. Prior to beginning any work, the Contractor shall supply the COR with the telephone number for the Superintendent. The Contractor s Competent Person that meets OSHA training guidelines, is capable of making decisions and acting on behalf of the Contractor shall be physically located on site at all times during performance of the contract. If the Contractor s Competent Person is absent from the job site for an extended period of time, the COTR may send all Contractor/sub-contractor employees off the job. Security Requirements: Contractor shall identify which employees will be working under the awarded contract. Contractor personnel shall include employees, sub-contractors, subcontractor employees, suppliers and delivery personnel entering the Medical Center. This does not apply to suppliers and delivery personnel making deliveries to the VA warehouse dock only. Those employees shall bring photo ID to obtain a VA Contractor identification badge that shall be worn above the belt at all times while on Medical Center property. Contractor s employees shall return all I.D. badges to designated personnel at time designated in the task order. The Contracting Officer s Technical Representative (COR) is responsible for the inspection of the work called for in this job. The Contracting Officer s Technical Representative will be identified in the task order by name, telephone number and location. Inspections made by the COTR are for the sole benefit of the Government and do not relieve the Contractor of any quality control responsibilities. The Safety Manager is responsible for safety inspections of all contract operations. The Safety Manager will be identified in the task order by name, phone number and location. Drawings General. Contract drawings (if applicable) will indicate the extent and location of work. If any departure from the contract drawings are deemed necessary by the Contractor, the details of such departure and the reasons therefore shall be submitted to the Contracting Officer for approval as soon as practical. No such departure shall be made without proper written permission of the Contracting Officer. The Contractor is responsible for all information and requirements in drawings and specifications that pertain to the task order. Verification of Dimensions The Contractor shall visit the job site to thoroughly familiarize himself with all the details of the work and working conditions. The Contractor shall also verify all dimensions in the field and shall advise the Contracting Officer of any discrepancy before performing any work. The Contractor shall be specifically responsible for the coordination and proper relation of his work to the building, structure, phasing and ensure the safety of employees and workmen. Smoking Policy. The Contractor shall not allow smoking in any building. The Contractor shall ensure employees smoke only in designated outdoor areas, 50 feet away from buildings. Parking/Traffic Regulations. The Contractor shall not park on grassy areas unless approved by the COTR and the Contractor agrees to restore areas back to VA standards. Drivers should be particularly concerned with pedestrian traffic. Yield to pedestrians in crosswalks. Posted speed limits and all other traffic controls are to be observed by operators at all times. Seat belt use is mandatory on the VA grounds. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Medical

$250,000.00

Public - Federal

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
69
Bidding Soon
885
All Active Projects
537
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 15, 2025

February 4, 2025

img_map_placeholder

1540 Spring Valley Dr, Huntington, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.