BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Springfield, Missouri. Completed plans call for the renovation of a educational facility.

This project is comprised of replacing and upgrading two (2) VAV air handlers, one (1) energy recovery ventilation unit, and three (3) rooftop units at Glendale High School in Springfield, Missouri. For general information please contact the Project Coordinator, Karsten Kargel, 417-523-0478. Design Professional of Record: Mechanical, Electrical, and Plumbing Consultant. Contract Scope: Construction, demolition, and renovation Last Request for Substitution Due: 7 days prior to due date of bids. Last Request for Information Due: 7 days prior to due date of bids. Bid Bond of a sum no less than five (5) percent of the Bid Amount A bid tab will be available to interested contractors within 48-hours of the bid due date. Notice to Proceed: February 28th, 2024, pending approval by the Board of Education on February 27th, 2024. Contract Time: To be stated in bid documents. The owner reserves the right to retain the security of all bidders until the successful bidder enters into the Contract or until 30 days after bid opening, whichever is sooner. Notice of award or rejection shall be given within 30 days of bid opening. Bid securities will be returned as soon as practical. It is the intent of the Owner to begin ordering equipment and supplies in March with full access to the building for installation on May 28th, 2024 and have the work substantially complete by the dates The Owner reserves the right to change the schedule or terminate the entire procurement process at any time. Question Cutoff Date: 1/29/2024 01:00 PM (ET), For questions regarding the project, please post questions Electronically . For general information please contact the Project Coordinator, Karsten Kargel, 417-523-0478. February 27th, 2024 - Anticipated Board of Education Approval. February 28th, 2024 - Notice to Proceed. August 2nd, 2024 - Major Installation Completion: All major installations shall be complete, including but not limited to new rooftop equipment, ductwork, electrical modifications, and building automation system components. Rooftop equipment shall be operational. August 9th, 2024 - Substantial Completion. All interior work shall be completed. September 13th, 2024 - Final Completion. Each bid shall be accompanied by a bid bond, executed by the Bidder and a duly authorized surety company, certified check, or cashierís check made unconditionally payable to the Springfield Public Schools R-12 for an amount not less than five percent (5%) of the maximum bid or bids submitted. The bid security pledges that the Bidder will enter into a Contract with the Owner on the terms stated in the Bid and will, if required, furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder. Bid Bond shall be written by a surety firm acceptable to the Owner, and shall guarantee that: if the Bidder is awarded Contract with Owner within thirty (30) days from the date bids were received, he will enter into a contract with the Owner within ten (10) days after receipt of notice of award, and that a Performance and Labor and Material Payment Bond for 100% of the amount of the Contract will be provided as required by Article 7.

Award

Educational

$780,000.00

Public - City

Renovation

27

14

5

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
18
Bidding Soon
358
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

February 28, 2024

img_map_placeholder

2727 S Ingram Mill Rd, Springfield, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.