BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 19, 2024 at 8:00 PM

Updated April 20, 2024

Site work for a water / sewer project in Spruce Grove, Alberta. Completed plans call for site work for a water / sewer project.

Watermain Improvement: Install on New Alignment approximately 1280m(lin) of Watermain positioned on the south edge of the roadway on Madison Crescent, east ditch along Campsite Road and north through a URW. All existing watermain service CC's are to be replaced at property line of each lot. All watermain hydrants and valves, are to be newly installed, removed, replaced and/or abandoned in place to accommodate the City's industrial standards. Sanitary Improvement: Multiple Sanitary Spot Repairs on a 300mm Concrete Pipe Provisional Item to Reline Approximate 950 linear meter of Existing Sanitary Sewer Main Site preparation/restoration including but not limited to traffic accommodation, public notification and liaison, site safety and cleanliness, locating existing shallow utilities, pavement removal and disposal, excavation, supply and installation of works, trench backfill to specification, re-construction of roadway and landscape to specification. All aspects of the project will require the general contractor to provide proper and adequate traffic control and safety measured approved by the City of Spruce Grove prior to construction. Documents can be obtained from https://selecteng.bidsandtenders.ca/

Bid Results

Water / Sewer

$2,369,250.00

Public - City

Site Work

15

11

19

2

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
31
Bidding Soon
498
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

June 7, 2024

Project location map

Madison Crescent, Spruce Grove, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.