Published February 26, 2024 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Montgomery, Alabama. Completed plans call for site work for a municipal facility; water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This Project Includes the Following: Sitework General Works Including but Not Limited to: All Connectors, Canopies, Entrances, Foundations, Deep Foundations Associated; All Loading Docks; All Exterior Signage; Hardscapes, All Items Not Included in Sitework and Landscaping; and Any Mep Associated. Final Sitework and Paving Including but Not Limited to: All Sitework; All Utility Work; Curb and Gutters; Paving; All Plumbing Final Connections (Downspouts, Sanitary, Etc). Final Landscape/irrigation Including but Not Limited to: Final Landscape Sitewide Everywhere Except East Along Art Wall; All Irrigation. Coordination and Supervision of the Entire Project; and All Related Work, as Indicated in the Scope of Work, Bid Documents and Contract Documents. Rsa Annex Building and Parking Deck - Phase 9 Sitework General Works | Final Sitework & Paving | Final Landscape/irrigation Located in Montgomery, Alabama for the Retirement Systems of Alabama the Work A Cashier's Check or Bid Bond Payable to Retirement Systems of Alabama in an Amount Not Less Than Five (5) Percent of the Amount of the Bid, but in No Event More Than $10,000, Must Accompany the Bidder's Proposal. Performance and Statutory Labor And Material Payment Bonds, Insurance in Compliance With Requirements, and Verification of E-verify Enrollment (Also With Proposals), Will Be Required at the Signing of the Contract. All Bidders Bidding in Amounts Exceeding That Established by the State Licensing Board for General Contractors Must Be Licensed Under the Provision of Title 34, Chapter 8, Code of Alabama, 1975, as Amended, and Must Show Such Evidence of License Before Bidding or Bid Will Not Be Received or Considered by Architect or Owner; the Bidder Shall Show Such Evidence by Clearly Displaying Their Current License Number on the Outside of the Sealed Envelope in Which the Proposal is Delivered; Bidder Must Also Include Their Current License Number on the Proposal Form. No Bid May Be Withdrawn After the Scheduled Closing Time for Receipt of Bids for a Period of Sixty (60) Days. This Project is Being Bid Excluding Taxes, and Requires the Contractor Comply With the Requirements of Act 2013-205, Which Was Signed Into Law on May 9, 2013. The Contractor and the Owner Will Be Required to Apply for Certificates of Exemption With the Alabama Department of Revenue Which Will Handle Administration of the Certificates. The Contractor Shall Account for the Tax Savings on the Proposal Form. Additional Qualifications and Requirements for General Contractor Bidders and Separate Subcontractors Are Indicated in the Bid and Contract Documents. The Owner Reserves the Right to Reject Any or All Proposals and to Waive Technical Errors if, in Their Judgment, the Best Interests of the Owner Will Thereby Be Promoted. All questions/concerns should be addressed to the Construction Manager and in accordance with specified requirements. Project Managers: Brennon Buckner (brennon.buckner@jescoinc.net) Epi Sosa (easosa@jescoinc.net) Caitlin Williamson (cwilliamson@jescoinc.net)

Post-Bid

Municipal

$500,000.00

Public - Federal

Paving, Site Work

40

26

46

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Site Maintenance, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Water Repellents, Thermal Protection, Vapor Retarders, Roofing and Siding Panels, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Wall and Door Protection, Corner Guards, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment, Educational and Scientific Equipment, Audio-Video Equipment, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Access Control and Intrusion Detection
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Trenching and Backfilling, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Auger Cast Grout Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Mowing, Pruning, Watering, Bases, Ballasts, and Paving, Base Courses, Unit Paving, Planting, Planting Preparation, Mulching, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
29
Bidding Soon
410
All Active Projects
246
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

March 28, 2024

img_map_placeholder

338 S Jackson St, Montgomery, AL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RSA Annex Building and Parking Deck Phase 9 - Site Completion Package

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.