Site work for a mixed-use development in Miami Beach, Florida. Completed plans call for site work for a conference / convention center; and water / sewer project.

The City of Miami Beach Facilities and Fleet Management Department is soliciting a bid for the design and installation of redundant fire pump system (Project) for the Miami Beach Convention Center. Contract duration: One Time Purchase Contract renewal: See Bid Documents Prices good for: Not Applicable Question Deadline 02/09/2024 at 10:00 AM ET Questions must be directed to PMPurchasing@miamibeachfl.gov. The City of Miami Beach Facilities and Fleet Management Department is soliciting a bid for the design and installation of redundant fire pump system (Project) for the Miami Beach Convention Center. City departments may, but are not required to, utilize the results of this ITQ to acquire the referenced service. Award of ITQ does not grant the successful contractor(s) exclusive rights or any guarantee of work to provide the services. General Conditions: o All work to be executed by a Certified Florida Fire Protection System Contractor. o Pricing to include all labor, tools, materials, equipment, and mobilization. Any change order must be approved by the Project Manager prior to beginning work. o Vendor will be responsible for all permits, as required. o Contractor shall maintain the site free of debris and trash to be picked up daily. o Department reserves the right to request a Schedule of Values for all bids received. o The City may reject any or all quotations, or any portion of the quotation, as it deems in the best interest of the City. Scope: Project Overview: The building facility is currently served by one electric motor driven, horizontal split case fire pump served by the fire water supply to the site. The bidder shall be responsible for any refurbishment and/or relocation of the existing fire pump and associated appurtenances (jockey pump and controllers) as required to accommodate the installation of the redundant fire pump system. The bidder shall engage an approved manufacturer's representative to confirm the operability of the existing pump, jockey pump and controllers, and produce documentation demonstrating the existing pumps operate in a manner consistent with the original pump curve (pressure and flow). The new redundant fire pump arrangement shall comply with current code requirements of the Florida Building Code, Florida Fire Prevention Code, NFPA 20 for fire pump installations and other NFPA standards applicable for the installation of the redundant fire pump system. The work will be completed such that the existing fire pump remains in service during the installation of the new redundant fire pump system, ensuring that areas of the building facility remain in service and have the fire protection systems pressurized by the pump. The building will be occupied and in normal use. Other building systems must remain in operation during the installation. The Contractor shall coordinate all piping and electrical disconnects and reconnects with the Owner. Every effort shall be made to minimize impact on the operation of the building's systems. Please see Fire Pump Specifications attached. Construction and Project Schedule: The Contractor shall submit at time of bid a Construction Plan that includes a Preliminary Project Schedule. A. The construction Plan shall indicate how the Contractor plans to address the following issues: 1. Design milestones, including the production of electronic floor plan and installation drawings. 2. Schedule for submittal of construction documents to the Owner's Fire Protection Consultant, the City of Miami Beach Fire Department, and the City of Miami Beach Building Department (Electrical). B. The preliminary schedule submitted with each of the Contractor's bid shall be in Microsoft Project X format and shall indicate all major trade activities, proposed milestones, and completion dates. The schedule must clearly indicate the logic and method in which the Contractor would approach the project. Further, the Contractor shall build into the Project Schedule, 30 calendar days of delay caused by the Owner or Facility Operator. There will be no credit taken should any of these days be unused nor shall there be any additional compensation paid for the 30 calendar days delay.

Post-Bid

Conference / Convention Centers

$150,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
122
Bidding Soon
1,768
All Active Projects
770
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 23, 2024

March 25, 2024

May 28, 2024

img_map_placeholder

1901 Convention Ctr Dr, Miami Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.