BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Huntington, West Virginia. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

The Work of this Project includes the following general elements: Phase One of the project includes construction of new sidewalks, basketball courts, trails, site furnishings, general area lightings, preparation of a challenge course (playground), dog park, and stormwater and utility improvements for the 4+ acre parcel owned by the Greater Huntington Park and Recreation District. All other improvements as identified in the plans and specifications. After opening, the bids will be compared as to quality, thoroughness, and cost by the Owner. A notice of award will be made public within 2 weeks of the bid opening. Bids are being solicited for all the work on the project. All technical questions should be referred to James Yost in writing or via email at j.yost@gaiconsultants.com by 5:00 pm January 23, 2024. Direct Phone calls are prohibited. Answers to technical questions and associated addenda will be issued no later than 5:00 pm January 30, 2024. Bid documents info : Bidders will be provided access to a drop box folder and can download bid documents in the form of PDF files at no charge. Request for access to documents must be made by email, and any requests received through mail, telephone fax, fax transmission, or other online communications will not receive a response Bid Documents may also be examined at the viewing depositories listed in the Bidding Documents. A certified check or a satisfactory Bid Bond furnished by a solvent surety company authorized to do business in the State of West Virginia in an amount equal to ten percent (10%) of the total bid must be submitted with each bid. The successful Bidder will be required to execute a contract and provide a Performance and a Labor and Material Payment Bond for 100% of the contract sum within 10 days of the contract award. All General Contractors shall include their license number in the space provided on the Bid Form and be licensed in the Stale of WV prior to submitting a bid in accordance Chapter 21, Article 11, of the WV Code. After the scheduled closing time for receipt of Bids, no Bid may be withdrawn for a period of 90 days.

Post-Bid

Playgrounds / Parks / Athletic Fields

$180,000.00

Public - City

Outdoor Lighting, Paving, Site Work

28

15

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
30
Bidding Soon
340
All Active Projects
160
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2024

March 11, 2024

img_map_placeholder

210 11th St, Huntington, WV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.