BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Rexburg, Idaho. Completed plans call for the renovation of a clubhouse / community center.

The City reserves the right to reject all Proposals or any Proposal not conforming to the intent and purpose of the Bid Documents. 1. Remove all Christmas light hangers including all adhesive residue and mechanical anchors in or on stone, cast stone or mortar. Patch all remaining voids with matching stone patching materials as per attached Stone Patching Specifications. 2. After discussing with the City and receiving approval, remove all anchors, pipes etc. not serving any current use. Patch remaining voids with stone patching materials as per attached Stone Patching Specifications. 3. Thoroughly clean all exterior stone as per attached Stone Cleaning Specifications. In addition to removing general soiling, carbon deposits and all other contaminants, remove all mortar smears off the face of stones from previous repointing campaigns. 4. Re-point mortar joints as per attached Stone Repointing Specifications. New repointing mortar should closely match the color, texture and shape of the contiguous sound mortar within a 5 foot radius of the areas being repointed. Special attention should be given to: a. the vertical 90 inside corners mortar joints between the pilasters as well as all other similar vertical inside corners. b. The mortar joints surrounding all window sill stones , arches and pilaster capstones. 5. Re-point all mortar joints between and below all parapet wall cap stones as per attached Stone Repointing Specifications. 6. Remove and reset any loose, dislodged or unstable parapet wall cap stones as per attached Specification for Removing & Resetting Stone, and Replacing Missing Stones. 7. Repair all cracked stone and cast stone as per the attached Stone Crack Injection Grout Specifications. 8. Do not remove or repoint non original repointing mortar that aesthetically matches well and is in sound condition. 9. Repair the major chips in the stones as per attached Stone Patching Specifications. 10. Apply penetrating and breathable water repellent to all exterior masonry as per attached Stone Water Repellent Specifications.

Award

Clubhouse / Community Centers

$569,400.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
6
Bidding Soon
92
All Active Projects
38
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

April 1, 2024

img_map_placeholder

51 N Center St, Rexburg, ID

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.