BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a service station / car wash facility in Morrisville, North Carolina. Completed plans call for site work for a service station / car wash facility.

Electric Transit Buses, Charging Stations, and Design and Construction Services Questions Due Date/Time: January 25, 2024, at 2pm EST Response to Questions Posted as Addendum (Estimated): January 30, 2024 ALL Inquiries to: Authority's Point of Contact: Paul Brown E-Mail: paul.brown@rdu.com. Raleigh-Durham Airport Authority (the "Authority") invites bids from qualified contractors or individuals (the "Contractor") interested in providing the Authority with a minimum of eight (8) and a maximum of twelve (12) Electric Low Floor Forty (40) Foot Transit Buses and design and construction services for 8 charging stations. The bus manufacturer will be the prime contractor for this project. It is the intention for this purchase to be partially or fully funded by Federal AIP (Group VZ-ZEV) Supplemental Discretionary Grant Funds. The Authority reserves the right to revise the schedule in its sole discretion. Your failure to attend will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Authority.

Bid Results

Service Station / Car Wash

$13,037,986.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
40
Bidding Soon
1,199
All Active Projects
495
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2024

July 12, 2024

img_map_placeholder

Multiple Locations, Morrisville, NC


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.