BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 6, 2025 at 8:00 PM

Updated October 7, 2025

Site work and paving for a road / highway in Cedar Park, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of a 4,000 foot shared use path along Brushy Creek Rd from Bell Blvd to US 183A. The project consists of a 10' concrete shared use path, a signalized CapMetro pedestrian crossing, to include but not limited to coordination with CapMetro and all required permits and insurance requirements, ADA ramps, drainage infrastructure, curb and gutter, minor grading, signing and pavement markings. This shared use path connects the regional trail system to the pedestrian facilities along Bell Blvd via the RMA trail. Estimate: $2.73 Million Construction of a 4000 foot shared use path along Brushy Creek Rd from Bell Blvd to US 183A. The project consists of a 10' concrete shared use path, a signalized CapMetro pedestrian crossing, to include but not limited to coordination with CapMetro and all required permits and insurance requirements, ADA ramps, drainage infrastructure, curb and gutter, minor grading, signing and pavement markings. This shared use path connects the regional trail system and pedestrian facilities along Bell Blvd vis the RMA trail. General contractors are invited to attend a voluntary virtual pre-proposal conference for this project. This meeting will be the only time City Staff is available to meet with proposers to discuss the project and directly answer questions Construction services for this project will be selected through competitive sealed proposals in accordance with Chapter 2269, of the Texas Government Code. The City will evaluate and rank the contractors based on the following selection criteria: 40% Contractor Relevant Experience and References, 50% Cost Proposal and 10% proposed schedule. The City shall select the contractor that offers the best value as determined by the selection criteria and ranking evaluation. The estimated total construction budget for this project is $2.86M. Each PROPOSAL must be accompanied by Proposal Security made payable to OWNER in an amount of five percent (5%) of PROPOSER's total amount Proposal and in the form of a certified or cashier's check or a Bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Any questions or concerns should either be submitted on the Q&A section of the project page on online or emailed to Paul Naughton (paul.naughton@cedarparktexas.gov) on or before August 1, 2025. The deadline to ask questions is 8/01/2025 2:00 PM CST

Award

Roads / Highways

$2,548,692.00

Public - City

Paving, Site Work

150

22

2

6

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
295
Active Projects
36
Bidding Soon
2,890
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.