Renovation of a water / sewer project in El Paso, Texas. Completed plans call for the renovation of a water / sewer project.

Construction of the Backup Power Generators and Fuel Storage and Dispensing Systems at The John T. Hickerson Water Reclamation Facility, Johnathan Rogers Water Treatment Plant, Fred Hervey Water Reclamation Plant, Haskell Street Wastewater Treatment Plant, and City-Wide Various Water Facilities. Guaranteed Maximum Price (GMP) 3 Construction Work Packages, Include: 3.1 Heavy Civil / General Building 3.2 Electrical and Iinstrumentation & Controls 3.3 Division 04 - Masonry Package 3.4 Division 09 - Finishes Package 3.5 HVAC Package 3.6 TPO Roofing Package 3.7 Overhead Crane System 3.8 Fuel Storage and Dispensing System Offeror must furnish a letter of guarantee from its Bonding agent to illustrate it can supply the required performance bond for the amount submitted on this project. Payment and Performance Bonds shall be supplied within ten (10) days of execution of the Contract. If the total contract price exceeds $25,000.00, the Contractor shall execute in accordance with the provisions of Chapter 2253, Texas Government Code, a Payment Bond in the amount equal to the total contract amount, solely for the protection of those supplying labor, materials and/or equipment in the prosecution of the subject contract. If the total contract price exceeds $100,000, the Contractor shall execute in accordance with the provisions of said Chapter 2253, Texas Government Code, a Performance Bond in the amount of the total contract price conditioned upon the faithful performance of the contract, solely for the protection of the Owner. Question Deadline 01/24/2024 at 2:00 PM MT For questions regarding this solicitation, technical questions, or additional information, please submit through online. Liquidated Damages Substantial Completion: If Substantial Completion has not been achieved on or before the Scheduled Substantial Completion Date, then Subcontractor shall pay to Contracotr the following liquidated damages: $4,610 per day for each day until Substantial Completion is achieved. Final Completion: If Final Completion has not been achieved by on or before the Scheduled Final Completion Date, then Subcontractor shall pay to Contractor the following liquidated damages: $2,290 per day for each day until Final Completion is achieved is achieved. Project No. J23-1-1022, E17-005, 3289D

Post-Bid

Water / Sewer

$3,500,000.00

Public - City

Renovation

171

12

154

4

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
8
Bidding Soon
255
All Active Projects
113
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.