Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a municipal facility in Sanford, Maine. Completed plans call for site work for a municipal facility.
The Sludge Landfill Closure Final Cover Project waste grading of approximately 5,000 cubic yards of on-site material, erosion control mechanisms, a 6-inch gas collection sand layer, 12-inch thick impervious borrow layer, furnish and install 40-mil textured geomembrane, 12-inch thick drainage sand, 8-inch thick vegetative cover layer, rip rap ditches and downspouts, and seed and mulch, as detailed in the Summary of Work. All bids must be made upon the forms. The successful Bidder will be required to provide a Bid Bond, Contract Performance Bond and a Contract Payment Bond, each for 100 percent of the contract price. The Owner reserves the right to reject any and all bids, to waive any and all informalities and to negotiate contract terms with the successful Bidder, and the right to disregard all non-conforming, non-responsive or conditional Bids. Discrepancies between words and figures will be resolved in favor of words. The work consists of the following at the Sanford Sewerage District Wastewater Treatment Facility in Sanford, Maine: 1) Extend three manholes within the area of final cover as shown on the Contract Drawings; 2) Extend cleanouts within the area of final cover as shown on the Contract Drawings; 3) Construction and maintenance of erosion control mechanisms as shown on the Contract Drawings; 4) Install gas collection vents as shown on the Contract Drawings: The gas collection system shall include all sand, fittings, adapters, and pipe. The Owner will supply approximately 8,900 cubic yards of gas collection sand on-site to be hauled and placed by the Contractor. The remaining quantity needed will be supplied, delivered, and placed by the Contractor; 5) Fine grade waste in area of final cover to grades shown on the Contract Drawings prior to impervious borrow placement; 6) Supply, haul, and placement of 12 inches of impervious borrow as shown on the Contract Drawings and described in the technical specifications; 7) Furnish and install 40-mil textured geomembrane: Work to include all necessary pipe boots and details for anchor trench termination, installing, testing, and documenting 40-mil textured HDPE geomembrane, installation required for the cover construction. The Contractor shall be responsible for storage and covering the geosynthetics delivered to the site. 8) Place the Owner-and Contractor-supplied drainage layer to depths and limits shown on the Contract Drawings. 9) Construction of perimeter and riprap ditches and sediment trap for stormwater management as shown on the Contract Drawings; 10) Manufacturing and placement of the vegetative cover soil layer: The contractor shall be responsible for manufacturing (mixing) the vegetative cover layer, loading, hauling, and placing the vegetative cover layer as shown on the Contract Drawings; and 11) Re-establish perimeter road in the area of the project. Every request for such interpretation should be in writing addressed to Sevee & Maher Engineers, Inc., 4 Blanchard Rd., P.O. Box 85A, Cumberland, Maine 04021 FAX to 207.829.5692 Question Deadline 01/27/2024
Award
Municipal
$1,165,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 1, 2024
March 4, 2024
Multiple Locations, Sanford, ME
Related To This Project
Sanford, ME
--
Sanford, ME
--
Sanford, ME
--
Sanford, ME
--
Sanford, ME
--
Sanford, ME
--
Sanford, ME
--
Sanford, ME
Bid Date: Jan 24 2024
Sanford, ME
Bid Date: Jan 11 2024
Sanford, ME
Bid Date: Dec 13 2023
Sanford, ME
--
Sanford, ME
--
Sanford, ME
Bid Date: Nov 29 2023
Sanford, ME
Bid Date: Nov 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.