BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Aurora, Missouri. Completed plans call for the demolition of a residential development; and for site work for a residential development.

The City of Aurora is accepting sealed bids for the demolition of the residential structure located at 126 W Hadley Street, Aurora, MO. Questions should be directed to the Community Development Department, (417) 678-5121 Ext. 320 or via email to chowlett@auroramo.gov Contractor shall provide all labor, materials, equipment, supplies, and taxes. Insurance, fuels, permits, retirement of the utilities, and any and all other items necessary to complete the demolition work, the removal of demolition materials, and disposal of materials and related work, as specified herein. Contractor shall complete all work. o Demolition and removal of the residential structure located at 126 W Hadley Street Aurora, MO 65605 o All concrete floor slabs, foundations, pilings, steps, and other above ground and underground improvements associated with the structure shall be removed. o All sidewalks, driveways and parking areas shall remain intact. o Fences shall remain, unless otherwise instructed to remove them. o All septic tanks shall be removed and the contents disposed of in accordance with appropriate ordinance and regulations. o All detached garages and accessory buildings shall be left intact. o Asbestos testing and removal have been completed. o Contractor is required to obtain a demolition permit from the City of Aurora Community Development Department prior to commencing work. o Contractor shall provide temporary erosion and sediment control on the property prior to the start of demolition operations. Sediment control shall be maintained for the full duration of the project. Contractor shall be responsible for the maintenance of controls and control structures and shall be responsible for any clean-up due to failure or inefficiency of such controls. Sedimentation run-off shall not be tolerated and if run-off occurs the Contractor shall take corrective action immediately. o Grading, backfill, and return to grade shall be performed as follows: All crawl spaces, lower levels, foundation areas, and any below ground area shall be filled and compacted with earth. The backfill shall not be frozen when placed and shall be compacted to a density of 95% of maximum density of the backfill material used as determined by ASTM designation D-68. The top 6 (six) inches of backfill shall be made with soil suitable for growth of grass and graded to a natural grade or surrounding undisturbed earth. Full basements can be filled with clean fill, including that from outside sites. All basement walls shall broken up and removed. Any change in vertical elevation greater than one for each horizontal five feet shall be backfilled to meet no more than 1:5 requirements. Final grading shall ensure adequate drainage offsite and not permit ponding of water. All filled and disturbed ground shall be smoothed for mowing. The contractor shall seed all disturbed ground with a fescue blend (10% annual rye, 90% turf type fescue or similar mix) seed and cover with straw. The contractor shall import fill as necessary to establish proper surface grades but the Contractor may cut and fill on site to the extent possible. o Discovery of Hazardous Materials: in the event previously unknown hazardous materials are discovered by the Contractor, the Contractor shall immediately suspend work in the specific location of the hazardous material and immediately notify the City Building Inspector or Community Development Director. o Clean-up: All demolition materials and debris shall be removed from the work concurrently with progress of work. Contractor shall not allow mud and debris from vehicle transporting demolition materials to litter any streets or highways. Contractor shall clean-up any such mud or debris at its sole expense. o Street Closures: The Contractor shall not close any street or divert any traffic without approval from the City's Community Development Director. o Final Inspection for Permit: Inspection by the Building Inspector or Community Development Director for final permit shall be requested by Contractor within twentyfour hours of completion of demolition of the site.

Award

Residential Subdivision

$20,710.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
24
Bidding Soon
483
All Active Projects
200
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

February 29, 2024

img_map_placeholder

126 W Hadley St, Aurora, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.