Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 18, 2025 at 7:00 PM
Updated October 1, 2024
Site work and paving for a road / highway in Lakewood, Washington. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
UPDATE:https://cityoflakewood.us/wp-content/uploads/2025/01/2025-2026Budget-Final.pdf This project will extend existing sanitary sewer mains from: the Grant Ave./ Orchard St. intersection approximately 850 feet northeast to the 14800 block of Grant Ave.; Grant Ave./Berkeley St. intersection approximately 380 feet southwest to the 15500 block of Grant Ave; Grant Ave./Orchard St. intersection approximately 340 feet to the 8400 block of Orchard St; Orchard St./Union Ave. intersection approximately 310 feet northwest to the 8300 block of Orchard St. New sewer line footage is 1,880 feet. Once the sanitary sewer system is operational is will make service available to 28 properties of which 18 are single family, 9 are multiple dwelling units ranging from 2 to 6 units per property. 1 property contains the child care center located on the grounds of Tillicum Elementary. Total number of dwelling units for the 28 properties is 39. In 2022 PWE Applied for ARPA grant funding from Pierce County. This project was selected for 50% funding per the grant guidelines. The funds can be used for design and construction Project is in City of Lakewood capital budget fy 2025-2026 CIP 444 __________________________________________________________________________________________________ The project will extend existing sanitary sewer mains from the Grant Ave./ Orchard St. intersection approximately 850 feet northeast to the 14800 block of Grant Ave.; from the Grant Ave./Berkeley St. intersection approximately 380 feet southwest to the 15500 block of Grant Ave; from Grant Ave./Orchard St. intersection approximately 340 feet to the 8400 block of Orchard St; and from the Orchard St./Union Ave. intersection approximately 310 feet northwest to the 8300 block of Orchard St. Total new sewer line footage is 1,880 feet. Road improvements will include new pavement, curb, gutter and sidewalk, and a new storm drainage system. Once the sanitary sewer system is operational is will make service available to 28 properties. 18 of the properties are single family. 9 of the properties have multiple dwelling units ranging from 2 to 6 units per property. 1 property contains the child care center located on the grounds of Tillicum Elementary. Total number of dwelling units for the 28 properties is 39. The current timing of the project is to design in 2024/2025 and construct it in 2026. As of January 9, 2024, this project is included in the City of Lakewood's 2024-2028 Capital Improvement Program (CIP) and funding allotted for construction in FY 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$735,600.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
Orchard St SW & Grant Ave SW, Lakewood, WA
Related To This Project
Lakewood, WA
Bid Date: Mar 05 2024
Lakewood, WA
Bid Date: Feb 01 2024
Lakewood, WA
Bid Date: Feb 01 2024
Lakewood, WA
--
Lakewood, WA
--
Lakewood, WA
--
Lakewood, WA
--
Lakewood, WA
Bid Date: Feb 12 2024
Lakewood, WA
--
Lakewood, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.